Laserfiche WebLink
A=COM <br /> Table 2—Future Out of Scope Work to meet EPA Administrative Consent Order <br /> thrlu iWgh December, 2020 <br /> No. Work Description Estimated Schedule Estimated <br /> Additional Basin 5/6 Modeling Analysis and Cost <br /> 2.1 Revised SCSAA Report(due November 30, July to November, 2017 $50,000 <br /> 2017 <br /> 2.2 Future CMOM Revisions(if needed, for one <br /> additional submittal) January to March, 2018 $15,000 <br /> 2.3 Future SCSAA Revisions(if needed,for one <br /> additional submittal) June to August, 2018 $15,000 <br /> EPA Closeout—To provide additional <br /> 2.4 assistance to the City and Barnes Thornburg October to December 31, <br /> to document that all ACO requirements have 2020 $10,000 <br /> been met <br /> Total $90,000 <br /> Table 3—Amendment#1 Summa <br /> No. Work Description Estimated <br /> Cost <br /> 3.1 Completed out of scope work per Table 1 $83,000 <br /> 3.2 Future out of scope work per Table 2 $90,000 <br /> TOTAL $173,000 <br /> As we have discussed, Amendment#1 above will restore the allowances ($59,820)that <br /> were originally included in the project and will enable AECOM to complete our original scope <br /> of work. Finally, a summary of our current and proposed contract is shown in Table 4 below. <br /> Table 4—Contract Summary <br /> No. Work Description Estimated <br /> Cost <br /> 4.1 Original Contract Se tember 21, 2015 $456,620 <br /> 4.2 Amendment#1 $173,000 <br /> REVISED CONTRACT TOTAL $629,620 <br />