Laserfiche WebLink
each opportunity until the goal is met. The bidder is to provide all work, all contacts, the <br /> method of contact(email,phone,personal, etc.), and the results of each contact. <br /> ' The bidders are reminded that the City can have no contact regarding the bid submittal after it <br /> has been provided, so their only opportunity is to provide evidence of their good faith efforts. <br /> ' For the benefit of the review that must be conducted by City staff, it is helpful in the contractors <br /> group the contacts according to the subcontracting opportunity. <br /> ' 2. Minority Workers Goal: 18%total hours worked should be performed by <br /> minority workers. <br /> a. The City tracks this goal through ePrismSoft and prevailing wage <br /> reports when required. <br /> IV. Detailed Project Requirements <br /> ' A. End Seals Specified <br /> B. 47-37_47-43 deposit removal under railroad (Sheet 7) <br /> C. Baker Woods Culvert(Sheet 23) <br /> ' V. Other Items <br /> ' Questions: <br /> ' Is trash bars required on the FE Section? Answer: No trash bars are required <br /> Pipe measured to be a 42" on sheet 23 please verb? Answer: Pipe is 42" CMP from the <br /> ' upstream FE section until 20'prior to outfall where there is an abrupt transition to 48" CMP. <br /> Contractor shall provide transition liner and 48" CMP over the last 20'ofpipe. <br /> ' Can sheet 23 culvert be crossed with plates? No heavy equipment is allow to cross culvert. Lift <br /> equipment and trucks can cross culvert with plates installed over culvert. <br />' END 10:47 AM <br />