My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-14 Approve Change Order ADS Environmental Services 2017 Flow Monitoring
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-14 Approve Change Order ADS Environmental Services 2017 Flow Monitoring
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 4:19:42 PM
Creation date
2/6/2018 4:19:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-14
Res Ord Title
Approve Change Order to the Agreement with ADS Environmental Services, Inc for 2017 Flow Monitoring Services City Project 2017-01
Department
Public Works
Approved Date
2/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMEMIAL <br /> Decatur, IL <br /> SSWVIICES® <br /> e. Percent Rainfall Ingress — To enable a comparison of RDII severity between basins of <br /> differing sizes (in the future), the net RDII volume for the basin (as defined by the flow <br /> monitoring location)will be"normalized". This means that the volume of RDII was divided <br /> by rainfall(inches)and by basin size(in acres or lineal feet(If)of pipe)to enable an apples- <br /> to-apples comparison of results among basins. Basin linear footage information will be <br /> calculated using the City's GIS data. The rainfall data are to be obtained from installed <br /> rain gauges for this project. <br /> f. Ranking of RDII Severity in Each Target Area using Normalized Values. <br /> g. GIS Based RDII Severity Maps for each basin and sub Basin based off the Normalized RDII <br /> Values and Capture Coefficient determined at each monitoring location (RDII/Acre). <br /> h. Recommending the next step(s)for RDII removal. <br /> Owner Activities: Owner(and consultants) agrees to perform the following functions in connection with <br /> this project. Certain activities must be acknowledged prior to ADS having an obligation to perform services <br /> enumerated herein. <br /> • The Owner will be responsible for coordinating the required site locations for this project, using <br /> maps,atlas pages,or GIS mapping files. <br /> • The Owner will be responsible for coordinating any necessary cleaning in required locations, <br /> where debris may be present. <br /> • Owner will designate a project manager or primary point of contact to coordinate ADS's work and <br /> to act as the Owner's representative with respect to the work performed under this Agreement. <br /> • Owner will provide access to and assist ADS to enter upon public and private lands as required for <br /> ADS to perform work under this Agreement;this excludes any regards to traffic control,which will <br /> be handled between ADS and a local sub-consultant. <br /> • Owner will not make repairs or perform maintenance or attempt to do so on the equipment <br /> covered under this Agreement unless authorized by ADS. This shall include removal, repair, <br /> relocation or installation of monitoring equipment. <br /> • Owner will assist ADS in obtaining any specialized City Permits to perform this work(if applicable). <br /> ADS Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.