.2 Services necessitated by the Owner's request for extensive environmentally responsible design <br /> alternatives,such as unique system designs,in-depth material research,energy modeling,or LEED® <br /> certification; <br /> .3 Changing or editing previously prepared Instruments of Service necessitated by the enactment or <br /> revision of codes,laws or regulations or official interpretations; <br /> A Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of <br /> performance on the part of the Owner or the Owner's consultants or contractors; <br /> .5 Preparing digital data for transmission to the Owner's consultants and contractors,or to other Owner <br /> authorized recipients; <br /> .6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner; <br /> .7 Preparation for,and attendance at,a public presentation,meeting or hearing; <br /> .8 Preparation for,and attendance at a dispute resolution proceeding or legal proceeding,except where the <br /> Architect is party thereto; <br /> .9 Evaluation of the qualifications of bidders or persons providing proposals; <br /> .10 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br /> or <br /> .11 Assistance to the Initial Decision Maker,if other than the Architect. <br /> §4.3,2 To avoid delay in the Construction Phase,the Architect shall provide the following Additional Services, <br /> notify the Owner with reasonable promptness,and explain the facts and circumstances giving rise to the need.If the <br /> Owner subsequently determines that all or parts of those services are not required,the Owner shall give prompt <br /> written notice to the Architect,and the Owner shall have no further obligation to compensate the Architect for those <br /> services: <br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the <br /> Architect(a deductive change order to the Contractor's contract sum will be processed periodically <br /> for the cost of such services incurred by the Owner); <br /> .2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br /> Contract Documents or where such information is available to the Contractor from a careful study <br /> and comparison of the Contract Documents,field conditions,other Owner-provided information, <br /> Contractor-prepared coordination drawings,or prior Project correspondence or documentation(a <br /> deductive change order to the Contractor's contract sum wilt be processed periodically for the cost of <br /> such services incurred by the Owner); <br /> .3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's <br /> proposals and supporting data,or the preparation or revision of Instruments of Service(a deductive <br /> change order to the Contractor's contract sum will be processed periodically for the cost of such <br /> services incurred by the Owner); <br /> .4 Evaluating an extensive number of Claims as the Initial Decision Maker; <br /> .5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to <br /> Instruments of Service resulting therefrom(a deductive change order to the Contractor's contract sum <br /> will be processed periodically for the cost of such services incurred by the Owner);or <br /> .6 Providing Construction Phase Services 60 days after(1)the date of Substantial Completion of the <br /> Work or(2)the anticipated date of Substantial Completion identified in Initial Information, <br /> whichever is earlier(a deductive change order to the Contractor's contract sum will be processed <br /> periodically for the cost of such services incurred by the Owner). <br /> §4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br /> Services.When the limits below are reached,the Architect shall notify the Owner: <br /> .1 two (2 )reviews of each Shop Drawing,Product Data item,sample and similar submittal of the <br /> Contractor(a deductive change order to the Contractor's contract sum will be processed periodically <br /> for the cost of such services incurred by the Owner) <br /> .2 Weekly visits to the site by the Architect over the duration of the Project during construction <br /> two (2 )visits for any portion of the Work to determine whether such portion of the Work is <br /> substantially complete in accordance with the requirements of the Contract Documents(a deductive <br /> change order to the Contractor's contract sum will be processed periodically for the cost of such <br /> services incurred by the Owner) <br /> 1 AIA Document 8101 r"—2007(formerly 01511m—1997).Copyright O 1974.1976.1987.1997 and 2007 by The American Institute of Architects.All rights <br /> reserved.WARNING:This AIA°Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 10 <br /> this AIA's Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible <br /> f under the law.This document was produced by AIA software at 17:03:54 on 01/3112018 under Order No.4966021632 which expires on 0411112018,and Is not <br /> for resale. <br /> User Notes: (389ADA17) <br />