4 two (2 )visits for any portion of the Work to determine final completion(a deductive change
<br /> order to the Contractor's contract sum will be processed periodically for the cost of such services
<br /> incurred by the Owner)
<br /> §4.3.4 If the services covered by this Agreement have not been completed within sixteen( 16)months of the date of
<br /> this Agreement,through no fault of the Architect,extension of the Architect's services beyond that time shall be
<br /> compensated as Additional Services.
<br /> ARTICLE 5 OWNER'S RESPONSIBILITIES
<br /> §5.1 Unless otherwise provided for under this Agreement,the Owner shall provide information in a timely manner
<br /> regarding requirements for and limitations on the Project,including a written program which shall set forth the
<br /> Owner's objectives,schedule,constraints and criteria,including space requirements and relationships,flexibility,
<br /> expandability,special equipment,systems and site requirements.Within 15 days after receipt of a written request
<br /> from the Architect,the Owner shall furnish the requested information as necessary and relevant for the Architect to
<br /> evaluate,give notice of or enforce lien rights.
<br /> §5.2 The Owner shall establish and periodically update the Owner's budget for the Project,including(1)the budget
<br /> for the Cost of the Work as defined in Section 6.1;(2)the Owner's other costs;and,(3)reasonable contingencies
<br /> related to all of these costs.If the Owner significantly increases or decreases the Owner's budget for the Cost of the
<br /> Work,the Owner shall notify the Architect.The Owner and the Architect shall thereafter agree to a corresponding
<br /> change in the Project's scope and quality.
<br /> §5.3 The Owner shall identify a representative authorized to act on the Owner's behalf with respect to the Project.
<br /> The Owner shall render decisions and approve the Architect's submittals in a timely manner in order to avoid
<br /> unreasonable delay in the orderly and sequential progress of the Architect's services.
<br /> §5.4 The Owner shall furnish surveys to describe physical characteristics,legal limitations and utility locations for
<br /> the site of the Project,and a written legal description of the site.The surveys and legal information shall include,as
<br /> applicable,grades and lines of streets,alleys,pavements and adjoining property and structures;designated wetlands;
<br /> adjacent drainage;rights-of-way,restrictions,easements,encroachments,zoning,deed restrictions,boundaries and
<br /> contours of the site;locations,dimensions and necessary data with respect to existing buildings,other improvements
<br /> and trees;and information concerning available utility services and lines,both public and private,above and below
<br /> grade,including inverts and depths.All the information on the survey shall be referenced to a Project benchmark.
<br /> § 5.5 The Owner shall furnish services of geotechnical engineers,which may include but are not limited to test
<br /> borings,test pits,determinations of soil bearing values,percolation tests,evaluations of hazardous materials,seismic
<br /> evaluation,ground corrosion tests and resistivity tests,including necessary operations for anticipating subsoil
<br /> conditions,with written reports and appropriate recommendations.
<br /> §5.8 The Owner shall coordinate the services of its own consultants with those services provided by the Architect.
<br /> Upon the Architect's request,the Owner shall furnish copies of the scope of services in the contracts between the
<br /> Owner and the Owner's consultants.The Owner shall furnish the services of consultants other than those designated
<br /> in this Agreement,or authorize the Architect to furnish them as an Additional Service,when the Architect requests
<br /> such services and demonstrates that they are reasonably required by the scope of the Project.The Owner shall
<br /> require that its consultants maintain professional liability insurance as appropriate to the services provided. The
<br /> Owner shall indemnify,defend and hold harmless the Architect and the Architect's consultants and their respective
<br /> employees,agents and representatives from any and all claims arising out of the services and information furnished
<br /> by the Owner and the Owner's consultants.
<br /> §5.7 The Owner shall furnish tests,inspections and reports required by law or the Contract Documents,such as
<br /> structural,mechanical,and chemical tests,tests for air and water pollution,and tests for hazardous materials.
<br /> §5.8 The Owner shall furnish all legal,insurance and accounting services,including auditing services,that may be
<br /> reasonably necessary at any time for the Project to meet the Owner's needs and interests. The Owner shall provide
<br /> (nit. AIA Document B181 TM—2007(formerly B761" —1997).Copyright O 1974,1978 1967 1997 and 2007 by The American Institute or Architects.AN rights
<br /> reserved.WARNING:This AIA` Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of 11
<br /> this AIAI Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible
<br /> f under the law This doc4ment was produced by AIA software at 17:03:54 on 0113112010 under Order No.4986021632 which expires on 0411112018,and is not
<br /> for resale.
<br /> User Notes: (3139ADA17)