the Architect with a copy of any agreement between the Owner and the Owner's representative regarding the <br /> Project. <br /> §5.9 The Owner shall provide prompt written notice to the Architect if the Owner becomes aware of any fault or <br /> defect in the Project,including errors,omissions or inconsistencies in the Architect's Instruments of Service. <br /> §6.90 Except as otherwise provided in this Agreement,or when direct communications have been specially <br /> authorized,the Owner shall endeavor to communicate with the Contractor and the Architect's consultants through <br /> the Architect about matters arising out of or relating to the Contract Documents.The Owner shall promptly notify <br /> the Architect of any direct communications that may affect the Architect's services. <br /> §5.11 Before executing the Contract for Construction,the Owner shall coordinate the Architect's duties and <br /> responsibilities set forth in the Contract for Construction with the Architect's services set forth in this Agreement. <br /> The Owner shall provide the Architect a copy of the executed agreement between the Owner and Contractor, <br /> including the General Conditions of the Contract for Construction. <br /> §5.12 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall <br /> obligate the Contractor to provide the Architect access to the Work wherever it is in preparation or progress. <br /> ARTICLE 6 COST OF THE WORK <br /> §6.1 For purposes of this Agreement,the Cost of the Work shall be the total cost to the Owner or,to the extent that <br /> the Project is not completed,the estimated cost to the Owner,to construct all elements of the Project designed or <br /> specified by the Architect and shall include contractors'general conditions costs,overhead and profit.The Cost of <br /> the Work does not include the compensation of the Architect,the costs of the land,rights-of-way,financing, <br /> contingencies for changes in the Work or other costs that are the responsibility of the Owner. <br /> §6.2 The Owner's budget for the Cost of the Work is provided in Initial Information,and may be adjusted <br /> throughout the Project as required under Sections 5.2,6.4 and 6.5.Evaluations of the Owner's budget for the Cost of <br /> the Work,the preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared <br /> by the Architect,represent the Architect's judgment as a design professional.It is recognized,however,that neither <br /> the Architect nor the Owner has control over the cost of labor,materials or equipment;the Contractor's methods of <br /> determining bid prices;or competitive bidding,market or negotiating conditions.Accordingly,the Architect cannot <br /> and does not warrant or represent that bids or negotiated prices will not vary from the Owner's budget for the Cost <br /> of the Work or from any estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect. <br /> §6.31n preparing estimates of the Cost of Work,the Architect shall be permitted to include contingencies for <br /> design,bidding and price escalation;to determine what materials,equipment,component systems and types of <br /> construction are to be included in the Contract Documents;to make reasonable adjustments in the program and <br /> scope of the Project;and to include in the Contract Documents alternate bids as may be necessary to adjust the <br /> estimated Cost of the Work to meet the Owner's budget for the Cost of the Work.The Architect's estimate of the <br /> Cost of the Work shall be based on current area,volume or similar conceptual estimating techniques.If the Owner <br /> requests detailed cost estimating services,the Architect shall provide such services as an Additional Service under <br /> Article 4. <br /> §6.41f the Bidding or Negotiation Phase has not commenced within 90 days after the Architect submits the <br /> Construction Documents to the Owner,through no fault of the Architect,the Owner's budget for the Cost of the <br /> Work shall be adjusted to reflect changes in the general level of prices in the applicable construction market. <br /> §6.5 If at any time the Architect's estimate of the Cost of the Work exceeds the Owner's budget for the Cost of the <br /> Work,the Architect shall make appropriate recommendations to the Owner to adjust the Project's size,quality or <br /> budget for the Cost of the Work,and the Owner shall cooperate with the Architect in making such adjustments. <br /> §6.6 If the Owner's budget for the Cost of the Work at the conclusion of the Construction Documents Phase <br /> Services is exceeded by the lowest bona fide bid or negotiated proposal by more than 10%,the Owner shall <br /> .1 give written approval of an increase in the budget for the Cost of the Work; <br /> .2 authorize rebidding or renegotiating of the Project within a reasonable time; <br /> .3 terminate in accordance with Section 9.5; <br /> Init. AIA Document B101 m—2007(formerly 8151"'—1997).Copyrightm 1974.1978,1987,1997 and 2007 by The American Institute of Architects.All rights <br /> reserved.WARNING:This AIAI Document is protected by U.S Copyright Law and international Treaties.Unauthorized reproduction or distribution of 12 <br /> this AIAt Document,or any portion of it,may result in severe civil and criminal penalties,and will he prosecuted to the maximum extent possible <br /> r under the taw.This document was produced by AIA software at 17:03.54 on 01/31/2018 under Order No.4966021632 whech expires on 04/11/2018.and is not <br /> for resale. <br /> User Notes: 1389ADA17i <br />