My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-21 Authorizing Professional Services Agreement with Dewberry ARchitects for New Fire Station No. 5
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-21 Authorizing Professional Services Agreement with Dewberry ARchitects for New Fire Station No. 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:22:56 PM
Creation date
3/6/2018 4:22:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-21
Res Ord Title
Authorizing a Professional Services Agreement with Dewberry Architects for Architectural and Engineering Services to Design a New Fire Station No. 5 at 330 W Mound Rd
Department
Fire
Approved Date
3/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> January 30,2017 <br /> Page 8 of 9 <br /> Task 10: Technology/Security/AV Design <br /> Data/Voice Structured Cabling System Planning and Design <br /> The Structured Cabling System scope of work shall include ANSI/EIA/TIA Standards Compliant cabling <br /> systems(Category 6,fiber,etc.),telecommunications and equipment room layouts and cross-connect <br /> fields,Transient Voltage Surge Suppression(TVSS),Work Are Outlet(WAO)floor plans,cable tray <br /> distribution,CATV distribution,fiber optic connections,and riser diagrams. This Scope of Work includes <br /> technical specification writing,detailed CAD drawing development,coordination of WAO placement and <br /> furniture design,review of proposals and shop drawings submittals,interim and final inspection and <br /> approval of certified structured cabling system testing for 20-year warranty. <br /> Infrastructure will be designed for a future station alerting system. <br /> Assumptions: N/A <br /> Exclusions: Station alerting system. <br /> Deliverables: Field Construction reports for every site visit,and punchlist. Schematic design narrative, <br /> design development drawings and specifications,construction documents for permit and bidding <br /> Price:Reference Price and Payment <br /> Schedule: Substantial Completion is expected to be complete ten months after start of construction. <br /> Task 11: Cost Estimating(Cummings) <br /> Under the direction of the Architect the cost estimator,Cummings will participate in a Schematic Design <br /> review meeting with the Architect,MEP/T,Structural and Civil engineers to compile information required <br /> to perform a cost estimate. The cost estimator will use drawings and design narratives to estimate the <br /> schematic design. <br /> The cost estimator will perform a second cost estimate at the completion of Design Development using <br /> drawings and specifications provided to Cummings by the Architect,MEP/T,Structural and Civil <br /> engineers. <br /> Assumptions: N/A <br /> Exclusions: Estimate during Construction Documents <br /> Deliverables: Schematic Design Estimate,Design Development Estimate <br /> Price:Reference Price and Payment <br /> Schedule: Each estimate will take 3—5 days to complete. <br /> Dewberry Scope of Work Fire Station 5—City of Decatur <br />
The URL can be used to link to this page
Your browser does not support the video tag.