Laserfiche WebLink
City of Decatur <br /> January 30,2017 <br /> Page 7 of 9 <br /> Price:Reference Price and Payment <br /> Schedule: Substantial Completion is expected to be complete ten months after start of construction. <br /> Task 9: Landscape Design(Schoppe Design Associates, Inc.) <br /> Research and Analysis <br /> Using information gathered during the Program Phase, SDA will inventory readily available existing data <br /> and physical site information including: <br /> • Architectural drawings <br /> • Proposed site plan <br /> • Landscaping Ordinances <br /> • Engineering plans <br /> Concept Phase <br /> Using the information gathered during the program phase and the research and analysis phase,SDA will: <br /> Prepare one overall schematic landscape design illustrating the scale,type,and organization of the proposed <br /> site and landscape improvements plantings. Items which will be considered in preparing the schematic plans <br /> will be: <br /> • Parking lot landscaping <br /> • Right-of-way plantings <br /> • Foundation plantings <br /> Prepare a concept level cost opinion of our schematic design using our generic system costs and an <br /> appropriate construction contingency. <br /> Review schematic design and cost information with you and with the owner(one WebEx meeting <br /> included). <br /> Revise the schematic design per the review with you and the owner(one revision included). <br /> Assumptions: N/A <br /> Exclusions: Revisions to previously completed or approved phases of service. <br /> Deliverables: Schematic Design and Construction Documents <br /> Price:Reference Price and Payment <br /> Schedule: Substantial Completion is expected to be complete ten months after start of construction. <br /> Dewberry Scope of Work Fire Station 5—City of Decatur <br />