My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-21 Authorizing Professional Services Agreement with Dewberry ARchitects for New Fire Station No. 5
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-21 Authorizing Professional Services Agreement with Dewberry ARchitects for New Fire Station No. 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:22:56 PM
Creation date
3/6/2018 4:22:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-21
Res Ord Title
Authorizing a Professional Services Agreement with Dewberry Architects for Architectural and Engineering Services to Design a New Fire Station No. 5 at 330 W Mound Rd
Department
Fire
Approved Date
3/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> January 30,2017 <br /> Page 7 of 9 <br /> Price:Reference Price and Payment <br /> Schedule: Substantial Completion is expected to be complete ten months after start of construction. <br /> Task 9: Landscape Design(Schoppe Design Associates, Inc.) <br /> Research and Analysis <br /> Using information gathered during the Program Phase, SDA will inventory readily available existing data <br /> and physical site information including: <br /> • Architectural drawings <br /> • Proposed site plan <br /> • Landscaping Ordinances <br /> • Engineering plans <br /> Concept Phase <br /> Using the information gathered during the program phase and the research and analysis phase,SDA will: <br /> Prepare one overall schematic landscape design illustrating the scale,type,and organization of the proposed <br /> site and landscape improvements plantings. Items which will be considered in preparing the schematic plans <br /> will be: <br /> • Parking lot landscaping <br /> • Right-of-way plantings <br /> • Foundation plantings <br /> Prepare a concept level cost opinion of our schematic design using our generic system costs and an <br /> appropriate construction contingency. <br /> Review schematic design and cost information with you and with the owner(one WebEx meeting <br /> included). <br /> Revise the schematic design per the review with you and the owner(one revision included). <br /> Assumptions: N/A <br /> Exclusions: Revisions to previously completed or approved phases of service. <br /> Deliverables: Schematic Design and Construction Documents <br /> Price:Reference Price and Payment <br /> Schedule: Substantial Completion is expected to be complete ten months after start of construction. <br /> Dewberry Scope of Work Fire Station 5—City of Decatur <br />
The URL can be used to link to this page
Your browser does not support the video tag.