City of Decatur <br /> January 30,2017 <br /> Page 6 of 9 <br /> Deliverables: Field Construction reports for every site visit,month pay application,punchlist and Letter <br /> of Substantial Completion <br /> Price:Reference Price and Payment <br /> Schedule: Substantial Completion is expected to be complete ten months after start of construction. <br /> Task 8: Civil Engineering <br /> Design Development: <br /> • Task Management: Manage the civil site task including coordination with subconsultant <br /> surveying firm to conduct the boundary survey of the project site,coordination with other <br /> disciplines,and civil discipline quality assurance checks. <br /> • Topographic survey of site. <br /> • Preparation of preliminary design elements including site grading plan and drainage/utility plan. <br /> This task will include preparation of basic grading designs,storm water collection/detention <br /> designs,and utility connection planning. Preparation of Site Development Plan was done in Site <br /> Plan Review/Conditional Use Permit phase. <br /> • Deliverable: 50%drawings including Site Development Plan,Grading Plan and Drainage& <br /> Utility Plan. <br /> Construction Documents: <br /> • Task Management: Coordinate and manage the civil site task in the production of the out-for-bid <br /> (OFB)set of plans. This will include coordination with other disciplines,design related <br /> meetings/conference calls(assumed 2 meetings during this phase),and discipline quality <br /> assurance checks. <br /> • Update and finalize civil site related calculations that were prepared in DD. <br /> • Prepare civil site plan sheets including existing site plan,site demolition plan,erosion control <br /> plan,site grading plan,site development plan,site drainage/utility plan,and site details. <br /> • Prepare civil site related specifications. <br /> • Deliverable: 95%and OFB sets of plans and specifications. <br /> Bidding Phase: <br /> • Answer bidder questions that arise from Pre-Bid Meeting(assume civil site task will not attend). <br /> • Contribute to preparation of project addenda for revised design elements. <br /> Construction Administration <br /> • Respond to construction Requests for Information <br /> • Construction Site Visits: An estimated two(2)site visits for the civil designers to review <br /> construction progress is assumed. <br /> • Punch List Visit: An estimated one(1)site visit for the civil designers to review substantial <br /> completion progress is assumed. <br /> Assumptions: N/A <br /> Exclusions: Additional site visits in excess of three(2)during construction. <br /> Deliverables: Field Construction reports for every site visit,and punchlist. Schematic design narrative, <br /> design development drawings and specifications,construction documents for permit and bidding <br /> Dewberry Scope of Work Fire Station 5—City of Decatur <br />