Laserfiche WebLink
§3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner's <br /> consultants.The Architect shall be entitled to rely on the accuracy and completeness of services and information <br /> furnished by the Owner and the Owner's consultants.The Architect shall provide prompt written notice to the <br /> Owner if the Architect becomes aware of any error,omission or inconsistency in such services or information. <br /> §3.1.3 A The Architect shall provide a schedule for the performance of the Architect's services as soon as <br /> practicable after the date of the Agreement.The schedule initially shall includes anticipated dates for the <br /> commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. <br /> I The schedule shall includes allowances for periods of time required for the Owner's review,for the performance of <br /> the Owner's consultants,and for approval of submissions by authorities having jurisdiction over the Project.Time <br /> limits established by the schedule shall not,except for reasonable cause,be exceeded by the Architect or Owner. <br /> With the Owner's approval,the Architect shall adjust the schedule,if necessary as the Project proceeds until the <br /> commencement of construction. <br /> §3.1.4 The Architect shall not be responsible for an Owner's directive or substitution made without the Architect's <br /> approval. <br /> §3.1.5 The Architect shall,at appropriate times,contact the governmental authorities required to approve the <br /> Construction Documents and the entities providing utility services to the Project.In designing the Project,the <br /> Architect shall respond to applicable design requirements imposed by such governmental authorities and by such <br /> entities providing utility services. <br /> §3.1.$The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents <br /> required for the approval of governmental authorities having jurisdiction over the Project. <br /> §3.2 SCHEMATIC DESIGN PHASE SERVICES <br /> §3.2.1 The Architect shall review with Owner the program and other information furnished by the Owner(prepared <br /> by Architect under separate agreement),and shall review laws,codes,and regulations applicable to the Architect's <br /> services.(Program validation,adjustments to internal functions and space allowances,and final determination of the <br /> project square footage will be finalized within thirty(30)days of the Project Kick-Off Meeting.) <br /> §3.2.2 The Architect shall prepare a preliminary evaluation of the Owner's program,schedule,budget for the Cost <br /> of the Work,Project site,and the proposed procurement or delivery method and other Initial Information,each in <br /> terms of the other,to ascertain the requirements of the Project.The Architect shall notify the Owner of(1)any <br /> inconsistencies discovered in the information,and(2)other information or consulting services that may be <br /> reasonably needed for the Project. <br /> §3.2.3 The Architect shall present its preliminary evaluation to the Owner and shall discuss with the Owner <br /> alternative approaches to design and construction of the Project,including the feasibility of incorporating <br /> environmentally responsible design approaches.The Architect shall reach an understanding with the Owner <br /> regarding the requirements of the Project. <br /> §3.2.4 Based on the Project's requirements agreed upon with the Owner,the Architect shall prepare and present for <br /> the Owner's approval a preliminary design illustrating the scale and relationship of the Project components. <br /> §3.2.5 Based on the Owner's approval of the preliminary design,the Architect shall prepare Schematic Design <br /> Documents for the Owner's approval.The Schematic Design Documents shall consist of drawings and other <br /> documents including a site plan,if appropriate,and preliminary building plans,sections and elevations;and may <br /> include some combination of study models,perspective sketches,or digital modeling.Preliminary selections of <br /> major building systems and construction materials shall be noted on the drawings or described in writing. <br /> §3.2.5.1 The Architect shall consider environmentally responsible design alternatives,such as material choices and <br /> building orientation,together with other considerations based on program and aesthetics,in developing a design that <br /> is consistent with the Owner's program,schedule and budget for the Cost of the Work.The Owner may obtain other <br /> environmentally responsible design services under Article 4. <br /> Init AIA Document B101-` 2007(formerly els1's—1997).Copyright d 1974,1978.1987.1997 and 2007 by The American htstitute of Architects.AN rights <br /> reserved.WARNING:This AIA" Document is protected by U.S.Copyright Law and International Treaties Unauthorized reproduction or distribution of <br /> thisAIV Document,or any portion of it,may result in severe civil and criminal penalties.and will be prosecuted to the maximum extent possible <br /> f under the law.This document was produced by AIA software at 17 03 54 on 0113112018 under Order No.4966021632 which expires on 0 411 112 01 8.and is trot <br /> for resale. <br /> User Notes: (389ADA17) <br />