My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-21 Authorizing Professional Services Agreement with Dewberry ARchitects for New Fire Station No. 5
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-21 Authorizing Professional Services Agreement with Dewberry ARchitects for New Fire Station No. 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 4:22:56 PM
Creation date
3/6/2018 4:22:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-21
Res Ord Title
Authorizing a Professional Services Agreement with Dewberry Architects for Architectural and Engineering Services to Design a New Fire Station No. 5 at 330 W Mound Rd
Department
Fire
Approved Date
3/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
confirming responsiveness of bids;(3)determining the successful bid,if any;and,(4)awarding()contracts for <br /> construction. <br /> §3.5.2 COMPETITIVE BIDDING <br /> §3.5.2.1 Bidding Documents shall consist of bidding requirements and proposed Contract Documents. <br /> §3.5.2.2 The Architect shall assist the Owner in bidding the Project by <br /> A procuring the reproduction of Bidding Documents for distribution to prospective bidders; <br /> .2 distributing the Bidding Documents to prospective bidders,requesting their return upon completion of <br /> the bidding process,and maintaining a log of distribution and retrieval and of the amounts of <br /> deposits,if any,received from and returned to prospective bidders; <br /> .3 organizing and conducting a pre-bid conference for prospective bidders; <br /> .4 preparing responses to questions from prospective bidders and providing clarifications and <br /> interpretations of the Bidding Documents to all prospective bidders in the form of addenda;and <br /> .5 organizing and conducting the opening of the bids,and subsequently documenting and distributing the <br /> bidding results,as directed by the Owner. <br /> §3.5.2.3 The Architect shall consider requests for substitutions,if the Bidding Documents permit substitutions,and <br /> shall prepare and distribute addenda identifying approved substitutions to all prospective bidders. <br /> (Paragtwphs Deleted) <br /> §3.6 CONSTRUCTION PHASE SERVICES <br /> §3.6.1 GENERAL <br /> §3.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set <br /> forth below and in AIA Document A201 Tht•2007,General Conditions of the Contract for Construction.If the Owner <br /> and Contractor modify AIA Document A201-2007,those modifications shall not affect the Architect's services <br /> under this Agreement unless the Owner and the Architect amend this Agreement. <br /> §3.6.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services.The <br /> Architect shall have authority to act on behalf of the Owner onlyto the extent provided in this Agreement.The <br /> Architect shall not have control over,charge of,or responsibility for the construction means,methods,techniques, <br /> sequences or procedures,or for safety precautions and programs in connection with the Work,nor shall the <br /> Architect be responsible for the Contractor's failure to perform the Work in accordance with the requirements of the <br /> Contract Documents.The Architect shall be responsible for the Architect's negligent acts or omissions,but shall not <br /> have control over or charge of,and shall not be responsible for,acts or omissions of the Contractor or of any other <br /> persons or entities performing portions of the Work. <br /> §3.6.1.3 Subject to Section 4.3,the Architect's responsibility to provide Construction Phase Services commences <br /> with the award of the Contract for Construction and terminates on the date the Architect issues the final Certificate <br /> for Payment. <br /> §3.6.2 EVALUATIONS OF THE WORK <br /> §3.6.2.1 The Architect shall visit the site at intervals appropriate to the state of construction,or as otherwise required <br /> in Section 4.3.3,to become generally familiar with the progress and quality of the portion of the Work completed, <br /> and to determine,in general,if the Work observed is being performed in a manner indicating that the Work,when <br /> fully completed,will be in accordance with the Contract Documents and the construction schedule.However,the <br /> Architect shall not be required to make exhaustive or continuous on-site inspections to check the quality or quantity <br /> of the Work.On the basis of the site visits,the Architect shall keep the Owner reasonably informed about the <br /> progress and quality of the portion of the Work completed,and report to the Owner(1)observed deviations from the <br /> Contract Documents and from the most recent construction schedule submitted by the Contractor,and(2)apparent <br /> defects and deficiencies observed in the Work. <br /> §3,6.2.2 The Architect has the authority to recommend to the Owner to reject Work that does not conform to the <br /> Contract Documents.Whenever the Architect considers it necessary or advisable,the Architect shall have the <br /> authority to recommend to the Owner to require inspection or testing of the Work in accordance with the provisions <br /> I nit. AIA Document 81011"'—2007(formerly 8151"'—19971.Copyright O 1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights <br /> reserved.WARNING:This AIA/Document is protected by U.S,Copyright Law and International Treaties Unauthorized reproduction or distribution of s <br /> this AIAT Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible <br /> t under the law.This document was produced by AIA software at 17:03:54 on 01/31/2018 under Order No.4966021632 which expires on 0411112018,and is not <br /> for resale. <br /> User Notes: (3B9ADA17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.