My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-36 Approving an Agreement with Strand Associates, Inc. for 2018 Water System Hydraulic Model Update and EPS CP 2018-04
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-36 Approving an Agreement with Strand Associates, Inc. for 2018 Water System Hydraulic Model Update and EPS CP 2018-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 10:27:38 AM
Creation date
4/20/2018 10:27:35 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-36
Res Ord Title
Resolution Approving an Agreement with Strand Associates, Inc. for Professional Engineering Services for the 2018 Water System Hydraulic Model Update and Extended Period Simulation City Project 2018-04
Department
Public Works
Approved Date
4/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Provide a discussion and recommendations to be included in a report toward TTHM concentrations <br /> compared to chlorine residual and reduction in TTHM's based on the model results and tank <br /> aeration strategies. Develop recommendations toward operation of the distribution system and <br /> installation of other components, including tank aeration systems,which are not typically analyzed <br /> in a water model for the purposes of TTHM reduction. <br /> 12. Develop a preliminary opinion of probable cost for the recommended improvements. <br /> 13. Prepare a draft report summarizing the findings and recommendations of the study. Submit three <br /> copies of the draft report to City for review and comment.Meet with City to review the draft report, <br /> finalize recommendations, and gather input on the schedule for improvements. <br /> 14. Develop a capital improvement plan that lists improvements, opinion of probable cost, including <br /> probable annual operating costs,and recommended implementation schedule for the recommended <br /> improvements. <br /> 15. Incorporate City's comments,as appropriate,into a final report.Provide City with three hard copies <br /> of the final report and one electronic portable document format file copy on compact disk and USB <br /> flash drive. <br /> A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.