Laserfiche WebLink
City of Decatur <br /> SOW# 1003418808101- P R E S I D I Oc} <br /> 5/24/2018 <br /> NetApp Storage Implementation for Police Video <br /> 3. EXECUTION PHASE <br /> 3.1. Introduction <br /> The Execution Phase of this project consists of implementing the detailed design, which was <br /> developed and finalized in the Systems Engineering and Planning Phase and documented <br /> in the Systems Engineering Report (SER). <br /> 3.2. Implementation and Testing <br /> 3.2.1. Implementation <br /> Presidio will configure and implement the following: <br /> • E2712 (existing storage) Shelf Add <br /> o Upgrade SANtricity code to latest supported release (Off-hours) <br /> o Rack/Stack/Cable three (3) DE 1600 drives shelves <br /> o Expand current DDP to include thirty-six (36) new 10TB drives <br /> o Create new volumes per SER <br /> o Present volumes to virtual file server(customer provided) <br /> • E2812 (new storage) <br /> o Rack/Stack/Cable one (1) new E2812 controller <br /> o Rack/Stack/Cable three (3) DE1600 drive shelves <br /> o Create DDP with forty-eight (48) new 12TB drives <br /> • Asynchronous replication configuration <br /> o Create iSCSI interfaces for replication <br /> o Configure replication between police video volumes <br /> 3.2.2. Testing <br /> Presidio will test and verify the configuration of the following: <br /> • Replication sessions between NetApp Volumes is successful <br /> 3.3. Knowledge Transfer <br /> 3.3.1. Administration Training <br /> Presidio will provide up to four (4) hours of instruction to staff to explain the settings and <br /> day-to-day management for the following components: <br /> • New NetApp E2812 storage array <br /> • Management of replication sessions between storage arrays <br /> 3.4. Project Closure <br /> At the completion of the project, Presidio will perform a Project Closure Meeting. Presidio <br /> and the Client will: <br /> Revision: 1.0 Confidential and Proprietary Page 7 of 15 <br />