My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-63 Purchase of Equipment and Services to Replace the Decatur Police Department Criminal Investigations Production Video Storage, Forensic Workstations and Add Necessary Electrical Services
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-63 Purchase of Equipment and Services to Replace the Decatur Police Department Criminal Investigations Production Video Storage, Forensic Workstations and Add Necessary Electrical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 8:41:31 AM
Creation date
6/8/2018 8:41:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2018-63
Res Ord Title
Resolution Authorizing the Purchase of Equipment and Services to Replace the Decatur Police Department Criminal Investigations Production Video Storage, Forensic Workstations and Add Necessary Electrical Services
Department
Police
Approved Date
6/4/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> SOW# 1003418808101- P R E S I D I Oc} <br /> 5/24/2018 <br /> NetApp Storage Implementation for Police Video <br /> 3. EXECUTION PHASE <br /> 3.1. Introduction <br /> The Execution Phase of this project consists of implementing the detailed design, which was <br /> developed and finalized in the Systems Engineering and Planning Phase and documented <br /> in the Systems Engineering Report (SER). <br /> 3.2. Implementation and Testing <br /> 3.2.1. Implementation <br /> Presidio will configure and implement the following: <br /> • E2712 (existing storage) Shelf Add <br /> o Upgrade SANtricity code to latest supported release (Off-hours) <br /> o Rack/Stack/Cable three (3) DE 1600 drives shelves <br /> o Expand current DDP to include thirty-six (36) new 10TB drives <br /> o Create new volumes per SER <br /> o Present volumes to virtual file server(customer provided) <br /> • E2812 (new storage) <br /> o Rack/Stack/Cable one (1) new E2812 controller <br /> o Rack/Stack/Cable three (3) DE1600 drive shelves <br /> o Create DDP with forty-eight (48) new 12TB drives <br /> • Asynchronous replication configuration <br /> o Create iSCSI interfaces for replication <br /> o Configure replication between police video volumes <br /> 3.2.2. Testing <br /> Presidio will test and verify the configuration of the following: <br /> • Replication sessions between NetApp Volumes is successful <br /> 3.3. Knowledge Transfer <br /> 3.3.1. Administration Training <br /> Presidio will provide up to four (4) hours of instruction to staff to explain the settings and <br /> day-to-day management for the following components: <br /> • New NetApp E2812 storage array <br /> • Management of replication sessions between storage arrays <br /> 3.4. Project Closure <br /> At the completion of the project, Presidio will perform a Project Closure Meeting. Presidio <br /> and the Client will: <br /> Revision: 1.0 Confidential and Proprietary Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.