My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-63 Purchase of Equipment and Services to Replace the Decatur Police Department Criminal Investigations Production Video Storage, Forensic Workstations and Add Necessary Electrical Services
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-63 Purchase of Equipment and Services to Replace the Decatur Police Department Criminal Investigations Production Video Storage, Forensic Workstations and Add Necessary Electrical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 8:41:31 AM
Creation date
6/8/2018 8:41:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2018-63
Res Ord Title
Resolution Authorizing the Purchase of Equipment and Services to Replace the Decatur Police Department Criminal Investigations Production Video Storage, Forensic Workstations and Add Necessary Electrical Services
Department
Police
Approved Date
6/4/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> SOW# 1003418808101 <br /> 5/24/2018 P R E S I D I O° <br /> NetApp Storage Implementation for Police Video <br /> 2. SYSTEMS ENGINEERING AND PLANNING PHASE <br /> 2.1. Introduction <br /> The Systems Engineering and Planning Phase is utilized for the project management and <br /> engineering teams to develop the technical detailed design of the solution, confirm the <br /> assumptions listed in this document, and develop a project plan. This phase will determine if <br /> there is a need for additional product and/or services due to changes in assumptions or <br /> responsibilities. If any changes are identified, an applicable change order will be provided. <br /> 2.2. Project Kickoff Meeting <br /> The Presidio Project Manager will schedule and conduct a Project Kickoff Meeting <br /> between Client and Presidio resources assigned to this project. <br /> • Introduce Professional Services team <br /> • Introduce Client contacts and project sponsors <br /> • Verification of roles and responsibilities <br /> • Review client timelines and set operational dates <br /> • Review this Statement of Work and all project deliverables and assumptions <br /> • Review hardware and software requirements against bill of materials <br /> • Identify resources throughout the life of the project <br /> 2.3. Systems Engineering and Planning Phase Design Topics <br /> The Primary function of the System Engineering & Planning phase is to conduct design <br /> session between Presidio and City of Decatur. During these design meetings, the <br /> following elements will be identified, reviewed and/or defined: <br /> • Disk shelf add for existing E2712 array <br /> • New E2812 array install at DR location <br /> • Networking parameters for iSCSI replication interfaces <br /> • Volumes to be replicated between sites <br /> Upon completion of the design sessions: <br /> • Presidio will provide a Systems Engineering Report (SER) that documents the <br /> systems configurations parameters and integration required for the <br /> implementation. <br /> • The Systems Engineering Report will be reviewed, approved and signed-off by <br /> City of Decatur prior to Presidio beginning the activities outlined in the Execution <br /> Phase. <br /> Revision: 1.0 Confidential and Proprietary Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.