Laserfiche WebLink
City of Decatur <br /> SOW# 1003418808101 <br /> 5/24/2018 P R E S I D I O° <br /> NetApp Storage Implementation for Police Video <br /> 4. ASSUMPTIONS <br /> Presidio makes the following assumptions in developing this Statement of Work. By signing this <br /> SoW, client agrees that these assumptions are correct and valid. Any changes to the following <br /> assumptions must be processed using Presidio Change Management Process and may impact <br /> the project duration and labor requirements. <br /> 4.1. General Assumptions <br /> The following project assumptions are made and will be verified as part of the engagement: <br /> • All Presidio activities will take place during normal working hours (Monday through <br /> Friday, 8:00 AM to 5:00 PM, excluding holidays) unless noted as "Off Hours" in this <br /> SOW. <br /> • If product is delivered to or staged at a Presidio facility, the acceptance of the <br /> hardware and software by Client occurs upon the receipt of good at Presidio. <br /> 4.2. Project Assumptions <br /> • Adequate power and cooling existing in both locations to support new storage arrays <br /> • 8u of rack space is available at DR site to support new storage array <br /> • Adequate number of 1 GbE copper connections exist at DR site to support new array <br /> 4.3. Out of Scope <br /> Installation or configuration of the following items is considered out of scope for this <br /> engagement: <br /> • Any items or tasks not explicitly listed as in-scope within this SoW are considered to <br /> be outside of the scope and not included within this SoW. <br /> 4.4. Client Responsibilities <br /> The following items are listed as responsibilities of City of Decatur for this engagement. City <br /> of Decatur is responsible for performing the items and activities listed in this section, or <br /> arranging for them to be performed by a 3rd party if appropriate. <br /> • Provide a single Client point of contact with the authority and the responsibility of <br /> issue resolution and the identification, coordination and scheduling of Client <br /> personnel to participate in the implementation of the SOW <br /> • Participate in System Engineering and Planning sessions and workshops <br /> • Provide or procure all appropriate hardware, software, licensing and media required <br /> for implementation of the SoW <br /> • Supply current equipment configuration for review if applicable <br /> • Schedule appropriate maintenance windows for system upgrades or installs and <br /> notify user community <br /> Revision: 1.0 Confidential and Proprietary Page 9 of 15 <br />