BDE SPECIAL PROVISIONS
<br /> For the April 27 and June 15,2018 Lettings
<br /> The following special provisions indicated by an Y are applicable to this contract and will be included by the Project
<br /> Development and Implementation Section of the BD&E. An`indicates a new or revised special provision for the letting.
<br /> File Name # Special Provision Title Effective Revised
<br /> 80099 1 Accessible Pedestrian Signals(APS) April 1,2003 Jan. 1,2014
<br /> 80382 2 Adjusting Frames and Grates April 1,2017
<br /> 80274 3 Aggregate Subgrade Improvement April 1,2012 April 1,2016
<br /> 80192 4 Automated Flagger Assistance Device Jan. 1,2008
<br /> 80173 5 Bituminous Materials Cost Adjustments Nov.2,2006 Aug. 1,2017
<br /> 80241 6 Bridge Demolition Debris July 1,2009
<br /> 50261 7 Building Removal-Case I(Non-Friable and Friable Asbestos) Sept. 1, 1990 April 1,2010
<br /> 50481 8 Building Removal-Case 11 (Non-Friable Asbestos) Sept. 1, 1990 April 1,2010
<br /> 50491 9 Building Removal-Case III(Friable Asbestos) Sept. 1, 1990 April 1,2010
<br /> 50531 10 Building Removal-Case IV(No Asbestos) Sept. 1, 1990 April 1,2010
<br /> 80366 11 X Butt Joints July 1,2016
<br /> 80386 12 Calcium Aluminate Cement for Class PP-5 Concrete Patching Nov. 1,2017
<br /> 80396 13 Class A and B Patching Jan. 1,2018
<br /> 80384 14 X Compensable Delay Costs June 2,2017
<br /> 80198 15 Completion Date(via calendar days) April 1,2008
<br /> 80199 16 Completion Date(via calendar days)Plus Working Days April 1,2008
<br /> 80293 17 Concrete Box Culverts with Skews>30 Degrees and Design Fills:5 5 April 1,2012 July 1,2016
<br /> Feet
<br /> 80311 18 Concrete End Sections for Pipe Culverts Jan. 1, 2013 April 1,2016
<br /> 80277 19 Concrete Mix Design-Department Provided Jan. 1,2012 April 1,2016
<br /> 80261 20 Construction Air Quality-Diesel Retrofit June 1,2010 Nov. 1,2014
<br /> 80387 21 Contrast Preformed Plastic Pavement Marking Nov.1,2017
<br /> 80029 22 Disadvantaged Business Enterprise Participation Sept. 1, 2000 July 2,2016
<br /> 80378 23 Dowel Bar Inserter Jan. 1,2017 Jan. 1,2018
<br /> 80388 24 X Equipment Parking and Storage Nov. 1,2017
<br /> 80229 25 Fuel Cost Adjustment April 1,2009 Aug. 1,2017
<br /> 80304 26 Grooving for Recessed Pavement Markings Nov. 1, 2012 Nov. 1,2017
<br /> 80246 27 X Hot-Mix Asphalt-Density Testing of Longitudinal Joints Jan. 1, 2010 April 1,2016
<br /> 80347 28 Hot-Mix Asphalt-Pay for Performance Using Percent Within Limits- Nov. 1,2014 Jan. 1,2018
<br /> Jobsite Sampling
<br /> 80383 29 Hot-Mix Asphalt-Quality Control for Performance April 1,2017 Nov. 1,2017
<br /> 80376 30 X Hot-Mix Asphalt-Tack Coat Nov. 1,2016
<br /> 80392 31 X Lights on Barricades Jan. 1,2018
<br /> 80336 32 Longitudinal Joint and Crack Patching April 1,2014 April 1,2016
<br /> 80393 33 Manholes,Valve Vaults,and Flat Slab Tops Jan. 1,2018
<br /> 80045 34 Material Transfer Device June 15, 1999 Aug. 1,2014
<br /> .
<br /> 80165 36 Moisture Cured Urethane Paint System Nov. 1,2006 Jan. 1,2010
<br /> 80349 37 Pavement Marking Blackout Tape Nov. 1, 2014 April 1,2016
<br /> 80371 38 Pavement Marking Removal July 1,2016
<br /> 80390 39 X Payments to Subcontractors Nov.2,2017
<br /> 80377 40 Portable Changeable Message Signs Nov. 1,2016 April 1,2017
<br /> 80389 41 x Portland Cement Concrete Nov. 1,2017
<br /> 80359 42 Portland Cement Concrete Bridge Deck Curing April 1,2015 Nov. 1,2017
<br /> 80385 43 X Portland Cement Concrete Sidewalk Aug. 1, 2017
<br /> 80300 44 Preformed Plastic Pavement Marking Type D-Inlaid April 1,2012 April 1,2016
<br /> ' 80328 45Progress Payments Nov.2,2013
<br /> 34261 46 Railroad Protective Liability Insurance Dec. 1, 1986 Jan. 1,2006