Laserfiche WebLink
File Name # Special Provision Title Effective Revised <br /> 80157 47 Railroad Protective Liability Insurance(5 and 10) Jan. 1,2006 <br /> 80306 48 Reclaimed Asphalt Pavement(RAP)and Reclaimed Asphalt Shingles Nov. 1,2012 Jan. 1,2018 <br /> (RAS) <br /> 80395 49 Sloped Metal End Section for Pipe Culverts Jan.1,2018 <br /> 80340 50 Speed Display Trailer April 2,2014 Jan. 1,2017 <br /> 80127 51 Steel Cost Adjustment April 2,2004 Aug. 1,2017 <br /> 80391 52 X Subcontractor Mobilization Payments Nov.2,2017 <br /> 80317 53 Surface Testing of Hot-Mix Asphalt Overlays Jan. 1,2013 April 1,2016 <br /> 80298 54 Temporary Pavement Marking(NOTE: This special provision was April 1,2012 April 1,2017 <br /> previously named 'Pavement Marking Tape Type IV".) <br /> 20338 55 Training Special Provisions Oct. 15, 1975 <br /> 80318 56 Traversable Pipe Grate for Concrete End Sections(NOTE: This Jan. 1,2013 Jan. 1,2018 <br /> special provision was previously named"Traversable Pipe Grate".) <br /> 80288 57 Warm Mix Asphalt Jan. 1, 2012 April 1,2016 <br /> 80302 58 Weekly DBE Trucking Reports June 2, 2012 April 2,2015 ' <br /> 80071 59 hd Working Days Jan. 1,2002 <br /> The following special provisions are in the 2018 Supplemental Specifications and Recurring Special Provisions. <br /> File Name Special Provision Title New Location Effective Revised <br /> 80368 Light Tower Article 1069.08 July 1,2016 <br /> 80369 Mast Arm Assembly and Pole Article 1077.03(a)(1) July 1,2016 <br /> 80338 Portland Cement Concrete Partial Depth Hot-Mix Recurring CS#35 April 1,2014 April 1,2016 <br /> Asphalt Patching <br /> 80379 Steel Plate Beam Guardrail Articles 630.02,630.05, Jan. 1,2017 <br /> 630.06,and 630.08 <br /> 80381 Traffic Barrier Terminal,Type 1 Special Article 631.04 Jan. 1,2017 <br /> 80380 Tubular Markers Articles 701.03, 701.15, Jan. 1,2017 <br /> 701.18,and 1106.02 <br /> The following special provisions require additional information from the designer. The additional information needs to be <br /> submitted as a separate document. The Project Development and Implementation section will then include the information in <br /> the applicable special provision. The Special Provisions are: <br /> • Bridge Demolition Debris 0 Building Removal-Case IV 0 Material Transfer Device <br /> • Building Removal-Case I • Completion Date Railroad Protective Liability Insurance <br /> • Building Removal—Case II a Completion Date Plus Working Days Training Special Provisions <br /> • Building Removal-Case III & DBE Participation Working Days <br />