My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-93 Authorizing a Contact with Dunn Company for Annual Street Restoration Airport Road CP 2018-08
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-93 Authorizing a Contact with Dunn Company for Annual Street Restoration Airport Road CP 2018-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 10:38:00 AM
Creation date
7/23/2018 10:37:52 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-93
Res Ord Title
Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company a Division of Tyrolt Inc. for Annual Street Restoration Airport Road City Project 2018-08
Department
Public Works
Approved Date
7/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPENSABLE DELAY COSTS (BDE) <br /> Effective: June 2, 2017 <br /> Revise Article 107.40(b) of the Standard Specifications to read: <br /> "(b) Compensation. Compensation will not be allowed for delays, inconveniences, or <br /> damages sustained by the Contractor from conflicts with facilities not meeting the above <br /> definition; or if a conflict with a utility in an unanticipated location does not cause a <br /> shutdown of the work or a documentable reduction in the rate of progress exceeding the <br /> limits set herein. The provisions of Article 104.03 notwithstanding, compensation for <br /> delays caused by a utility in an unanticipated location will be paid according to the <br /> provisions of this Article governing minor and major delays or reduced rate of production <br /> which are defined as follows. <br /> (1) Minor Delay. A minor delay occurs when the work in conflict with the utility in an <br /> unanticipated location is completely stopped for more than two hours, but not to <br /> exceed two weeks. <br /> (2) Major Delay. A major delay occurs when the work in conflict with the utility in an <br /> 1unanticipated location is completely stopped for more than two weeks. <br /> (3) Reduced Rate of Production Delay. A reduced rate of production delay occurs when <br /> the rate of production on the work in conflict with the utility in an unanticipated <br /> location decreases by more than 25 percent and lasts longer than seven calendar <br /> days." <br /> Revise Article 107.40(c) of the Standard Specifications to read: <br /> (c) Payment. Payment for Minor, Major, and Reduced Rate of Production Delays will be <br /> made as follows. <br /> (1) Minor Delay. Labor idled which cannot be used on other work will be paid for <br /> according to Article 109.04(b)(1) and (2) for the time between start of the delay and <br /> the minimum remaining hours in the work shift required by the prevailing practice in <br /> the area. <br /> Equipment idled which cannot be used on other work, and which is authorized to <br /> standby on the project site by the Engineer, will be paid for according to <br /> Article 109.04(b)(4). <br /> (2) Major Delay. Labor will be the same as for a minor delay. <br /> Equipment will be the same as for a minor delay, except Contractor-owned <br /> equipment will be limited to two weeks plus the cost of move-out to either the <br /> Contractor's yard or another job and the cost to re-mobilize, whichever is less. <br />
The URL can be used to link to this page
Your browser does not support the video tag.