My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-93 Authorizing a Contact with Dunn Company for Annual Street Restoration Airport Road CP 2018-08
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-93 Authorizing a Contact with Dunn Company for Annual Street Restoration Airport Road CP 2018-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 10:38:00 AM
Creation date
7/23/2018 10:37:52 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-93
Res Ord Title
Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company a Division of Tyrolt Inc. for Annual Street Restoration Airport Road City Project 2018-08
Department
Public Works
Approved Date
7/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed street list for Street Restoration is as follows see attached location ma : <br /> Surface Length Length <br /> Street Begin End Treatment (feet) (Lane <br /> Miles <br /> Change of Change of <br /> Airport Pavement Pavement Mill and Overlay <br /> Road North of US South of w/Edge 7,140 2.70 <br /> 36 Country Club Strengthening <br /> Rd. <br /> Total Length 7,140 2.70 <br /> Letting Results <br /> The project scope and specifications were prepared by the Engineering Division and approved by the <br /> Illinois Department of Transportation(IDOT) for the use of Motor Fuel Tax funds. The project was <br /> advertised on June 27, 2018 and July 4, 2018, and bids were opened on July 9, 2018. The results of <br /> the letting are as follows (bid tabulation attached): <br /> Bidder Bid Price Compared to Engineer's Est. <br /> Over Under <br /> Dunn Company $1,508,735.65 0.69% <br /> Engineer's Estimate $1,498,359.96 ------ <br /> Dunn Company and Feutz Contractors, Inc. took out bid packages for the Street Restoration Project <br /> and Dunn Company submitted the only bid. Dunn Company provided the lowest responsible bid at <br /> .69%above the engineer's estimate. The re-bid increased the project cost by approximately <br /> $263,000. All cost increases were attributed to the increased work and material specified that were <br /> left out of the previous bid that was rejected. The asphalt price is lower than typical mill and overlay <br /> projects due to the large quantities of asphalt on this project, all being used in a single location. Dunn <br /> Company has successfully completed many jobs of this type for the City. Following approval by the <br /> Mayor and City Council, the contracts and bid tabulation will be forwarded to the Illinois Department <br /> of Transportation for final approval in accordance with the rules governing the disbursement of State <br /> Motor Fuel Tax funds. <br /> SCHEDULE: <br /> Following approval of the contract by the City Council the contracts will be forwarded to the Illinois <br /> Department of Transportation(IDOT) in Effingham for approval. Work on this project shall begin <br /> after a"Notice to Proceed"has been issued from the City. The Street Restoration project is <br /> scheduled to be complete by mid to late August. <br /> _2 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.