Laserfiche WebLink
EXHIBIT B Schedule 1 <br /> • Traffic control is included per Illinois IDOT requirements. Any additional labor and material <br /> required for lane closures is not included. <br /> • The addition of light fixtures in "poorly" lit areas is not covered under this Scope of Work unless <br /> otherwise noted. <br /> • All project related rubbish, cardboard, packing materials, etc. will be placed in designated <br /> locations provided by JCI. <br /> • Existing Fuse protection will be removed and reinstalled during fixture replacement. Existing <br /> fuse/disconnect will be left in place, and will include replacement of fuses if necessary for <br /> installation of the new fixtures. Any repairs to electrical primary and secondary feeds will be the <br /> responsibility of the municipality. <br /> • Provide lockout/tagout on electrical cabinets. <br /> • Provide daily work reports to the Customer describing location of work crews. <br /> • The auditorium lighting in the Civic Center is not included. <br /> • Updates/upgrades to the existing control system in the Civic Center arena. <br /> ECM-5 Library VAV System DDC Controls Upgrade <br /> General Scope: This scope of work addresses replacement of the temperature controls for the City of <br /> Decatur Public Library. <br /> Scope of Work: (Also see Appendix 1. for the line-by-line description of fixtures and specific scope) <br /> 1. Disconnect and remove the existing temperature controls for Air Handling Unit "AHU-1", Eighteen <br /> (18) Variable Air Volume (VAV) terminal boxes, and Seventeen (17) hot water Reheat Coils <br /> (RHCs) and Four(4) Electric Reheat Coils (ERCs). <br /> 2. Disconnect existing DDC controls from Reheat Coils (RHC) and Fan Powered VAV Boxes (VAV) <br /> and Electric Reheat Coils (ERC). Install new controls on each of the devices. <br /> 3. Install new Building Automation System (BAS), network trunk, controllers, thermostats, hardware, <br /> software programming and graphical interface to view all devices. <br /> 4. Connect existing controller that serves boiler and chiller system into the new BAS. <br /> 5. Provide air balancing for each VAV box per original design. <br /> 6. Provide validation of all new control points, schedules and setpoints. <br /> 7. Provide startup and training. <br /> HVAC &Temperature Controls Exclusions: <br /> • Resolution of existing design, service, and or distribution conditions known or unknown. <br /> • Temporary space conditioning unless otherwise identified in a FIM Scope of Work. <br /> • Test and balance of existing air and water HVAC systems unless otherwise noted in a <br /> specification FIM Scope of Work. <br /> • Duct cleaning and coil cleaning unless otherwise identified in a FIM Scope of Work. <br /> • Repair or replacement of defective mechanical, electrical and controls equipment and electrical <br /> distribution system, except the equipment described in the Scope of Work(Defective equipment <br /> identified by JCI during implementation of the Scope of Work will be brought to the attention of <br /> the Customer). <br /> • Repairs/replacement of insulation, piping or ductwork found to be corroded or rusted and <br /> unacceptable for installation of components or fittings required for installation other than what <br /> is specified in the Scope of Work. <br /> • Providing Ethernet ports for buildings or any infrastructure hardware/software needed to <br /> connect the building to the base IT network. <br /> • Connection to the Owners Wide-Area Network to be coordinated with Client's IT Services. <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> 02008 Johnson Controls,Inc. <br /> 7 <br />