My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-96 Authorizing an Amendment to the Services Agreement with Johnson Controls CP 2018-07
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-96 Authorizing an Amendment to the Services Agreement with Johnson Controls CP 2018-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:49 PM
Creation date
8/8/2018 10:32:34 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-96
Res Ord Title
Resolution Authorizing an Amendment to the Services Agreement with Johnson Controls CP 2018-07
Department
Public Works
Approved Date
8/6/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B Schedule 1 <br /> • Removal or replacement of ceiling tiles is not included. <br /> • Work in or around Asbestos contaminated areas is excluded. <br /> • All electrical wiring other than that required for ballast replacement within the existing lighting <br /> fixtures is excluded. <br /> • It is assumed that the present system meets the lighting code. If the existing system fails to meet <br /> NEC requirements, we will contact the customer. Any required changes or upgrades are not <br /> covered by JCI. <br /> • The addition of fixtures in "poorly lit" areas is not covered under this "Scope of Work" unless <br /> otherwise noted. <br /> • It is assumed that the existing fixtures are not security grade fixtures. (Tamperproof, locking <br /> fastener type lens or door frame). <br /> • Existing fixtures are in a well-maintained condition. (Not rusted or brittle). <br /> • Pricing is valid for 90 days from the quotation date. Executed contract and product submittal <br /> approval is required prior to procurement of materials. <br /> • All work done in accordance with industry standards and approved safety practices. Professional <br /> performance by licensed, insured and certified personnel skilled in lighting retrofit services. <br /> • All work performed during normal business hours, 40 hours work week, Monday through Friday; <br /> weekends or overtime not included. <br /> • All circuit breakers, contactors and switches are assumed operational. <br /> • JCI shall be given ample notice for security clearance procedures required for access to any <br /> facility included in the scope of work. <br /> • The street lighting portion is proposed as a one to one replacement based upon the existing <br /> fixture type, i.e. existing cobrahead luminaires will be replaced with the LED equivalent. <br /> Decorative luminaires will be replaced with the LED equivalent and housing shall be same <br /> appearance as existing and as approved by the Customer. <br /> • If specified materials become either temporarily or permanently unavailable for reasons beyond <br /> the control of JCI, then the expected time for performance of the work will be extended to the <br /> extent of unavailability and we reserve the right to provide Customer approved equivalent <br /> substitutions at no price increase. <br /> • After 1st year, Warranty Labor is to be the responsibility of the owner, who will assign a <br /> maintenance contractor or perform the maintenance with city staff. <br /> • Warranty after year 1 will be Manufacturer's warranty for materials only. <br /> • Manufacturer warranties of lamps and fixtures installed and components are covered by the <br /> individual manufacturers published policies. JCI will furnish contact information for each <br /> manufacturer and warranty information for approval by the Customer. Alleged defective product <br /> may be required for return to factory for analysis. <br /> • Customer is tax exempt and must provide JCI with exemption certificate. <br /> • Electrical permits and fees are not included <br /> • Cost for replacement of existing wiring and/or electrical issues in interior/exterior fixtures is not <br /> included. If defects are found these will be documented by JCI and the Customer is to be notified. <br /> • Cost for repair or replacement of yellowed, cracked, damaged or missing fixture lenses, louvers <br /> or other components has not been included. <br /> • JCI will record field issues related to: condition of wiring in poles, missing or corroded fasteners, <br /> broken or damaged poles/fixtures. Recordings will be input in the JCI Worksite and made <br /> available to the Customer. <br /> • JCI shall provide repairs within 5 days after notification if JCI is mobilized on site or within 10 days <br /> after notification if JCI is not mobilized on site. <br /> • Any difference in fixture type and quantities will be adjusted and invoiced for actual install and the <br /> savings will be adjusted accordingly only within the contract limits. <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ©2008 Johnson Controls,Inc. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.