Laserfiche WebLink
EXHIBIT B Schedule 2 <br /> II. NON-MEASURED PROJECT BENEFITS <br /> Customer has furnished the foregoing information to JCI, which information forms the basis of the Non-Measured <br /> Project Benefits. Customer agrees that the Non-Measured Project Benefits are reasonable and that the installation <br /> of the Improvement Measures will enable Customer to take actions that will result in the achievement of such Non- <br /> Measured Project Benefits. <br /> Summary of Non-Measured Miscellaneous Benefits <br /> Year-1 <br /> Non-Measured <br /> Revenue <br /> ECM Descri tion of Benefits $/Yr. <br /> Lighting These savings are attributable to a reduction in material costs as a result $22,701 <br /> Operations& of replacing fluorescent/HID/Compact Fluorescent lamps with LED <br /> Maintenance lamps and eliminating fluorescent ballasts. <br /> Material Repair In addition the inclusion of connected lighting controls for the streetlights <br /> Costs Benefits will extend the useful life of the new LED fixtures as a result reducing <br /> lamp output <br /> 11 Total Year-1 Non-Measured O&M Repair Cost Benefits $22,701 <br /> Customer agrees that the Non-Measured Project Benefits are reasonable and that the installation of the <br /> Improvement Measures will enable Customer to take actions that will result in the achievement of such Non- <br /> Measured Project Benefits... <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ©2008 Johnson Controls,Inc. <br /> 12 <br />