EXHIBIT B Schedule 2 <br /> III. MEASUREMENT AND VERIFICATION METHODOLOGIES <br /> The following is a brief overview of the measurement and verification methodologies applicable to the Improvement <br /> Measures set forth below. JCI shall apply these methodologies, as more fully detailed in the guidelines and <br /> standards of the International Measurement and Verification Protocol(IPMVP)and/or the Federal Energy <br /> Management Program(FEMP), in connection with the provision of M&V Services hereunder. <br /> Measured Benefits: <br /> ECM-1 Streetlights LED Upgrade $25,487 <br /> ECM-2 Parking Lot LED Fixtures Upgrade $9,969 <br /> ECM-3 Library Interior/Exterior LED Lighting Upgrade $24,751 <br /> ECM-4 Civic Center Interior/Exterior LED Lighting $ <br /> Upgrade 24,690 <br /> ECM-5 Library Systems VAV Controls Upgrade $11,895 <br /> Total $96,792 <br /> Option A <br /> Partially Measured Retrofit Isolation <br /> Partial measurement means that some but not all parameters will be measured. Careful review of the design and <br /> installation of Improvement Measures is intended to demonstrate that the stipulated values fairly represent the <br /> probable actual values. Agreed-upon values will be shown in the measurement and verification plan, along with <br /> analysis of the significance of the error they may introduce. Engineering calculations using short-term pre and post- <br /> retrofit measurements and agreed upon non-measured values are used to calculate Measured Project Benefits for <br /> the duration of the Guarantee Term. <br /> Measurements will include energy consumption data collection for the existing lighting fixtures before and after the <br /> Installation. No ongoing measurements will be taken. <br /> Metered Fixtures: (ECM-1, ECM-2, ECM-3 and ECM-4) <br /> Light Fixtures Energy Calculation <br /> Energy Saved= [(kWh/Year) = kW(pre installation)—kW(post installation)]x Quantity x Operating hours <br /> Energy Cost Saved = Energy Saved x Metered Electric Rate($/kWh) [see Section IV] <br /> Parameter variables to be agreed upon <br /> Pre-Retrofit and Post-retrofit hours of operation as shown in Section V. PRIMARY OPERATIONS SCHEDULE <br /> PRE & POST RETROFIT. <br /> Parameter to be measured for Metered Light Fixtures <br /> Sample population fixture wattages pre-and post-retrofit for each type of light fixtures. <br /> Un-Metered Fixtures: (ECM-1) <br /> Light Fixtures Energy Calculation <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ©2008 Johnson Controls,Inc. <br /> 13 <br />