Laserfiche WebLink
EXHIBIT B Schedule 2 <br /> Energy Saved = [(kWh/Year) = kWh (Utility Defined kWh/year Pre-Installation)—kW(Utility Defined kWh/year <br /> Post Installation)]x Quantity <br /> Energy Cost Saved = Energy Saved (kWh/Year)x Un-Metered Electric Rate($/kWh) [see Section IV] <br /> Parameter variables to be agreed upon <br /> Electric Utility defined kWh per Fixture Type: <br /> Fixture Type Utility Defined kWH/Year <br /> 10OW HPS 504 kWh <br /> 150W HPS 728 kWh <br /> 150W MH 772 kWh <br /> 250W HPS 1200 kWh <br /> 40OW HPS 1880 kWh <br /> 39W LED 156 kWh <br /> 98W LED 392 kWh <br /> 107W LED 428 kWh <br /> 150W LED 600 kWh <br /> 190W LED 780 kWh <br /> Fan Motor Control and VAV DDC Controls: (ECM-5) <br /> Un-Occupied Fan Motor Energy Calculation <br /> Energy Saved = [(kWh/Year) =kW(pre installation)—kW(post installation)]x HP x Motor Load Factor x 0.746 <br /> ((kW/HP)x Operating hours <br /> Energy Cost Saved = Energy Saved x Electric Rate($/kWh)[see Section IV] <br /> Parameter variables to be agreed upon <br /> Pre-Retrofit and Post-retrofit hours of operation as shown in Section V. PRIMARY OPERATIONS SCHEDULE <br /> PRE &POST RETROFIT. <br /> Motor Load Factor=75% <br /> Motor HP = 120 HP(Supply and Return Fan Motors) <br /> Parameter to be measured <br /> Un-Occupied Fan Motor kW trend data. <br /> Occupied Period VAV Fan Motor Energy Calculation <br /> Energy Saved = [(kWh/Year) =kW(pre installation)—kW(post installation)]x HP x Motor Load Factor x 0.746 <br /> ((kW/HP)x Operating hours <br /> Energy Cost Saved = Energy Saved x Electric Rate($/kWh)[see Section IV] <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ©2008 Johnson Controls,Inc. <br /> 14 <br />