Laserfiche WebLink
Exhibit A <br /> Scone Details Description <br /> Task 00100 Survev and Field Work <br /> To�ographic Survey-field work <br /> Coordination with the City of Decatur. Prepare the Right of Entry agreements for NS RR and CN RR. <br /> Coordinate the survey with the railroads and schedule flagging protection as needed.Coordinate access with <br /> ADM and other facilities and land owners within the survey limits.Attend meetings and or calls as needed. <br /> The project team will verify the horizontal and vertical control supplied from Phase I within the project limits <br /> and establish additional site horizontal and vertical control for the project. <br /> Conduct LiDAR ground surveys and traditional surveys to supglement the LiDAR information collected. <br /> These surveys are to be conducted as shown on the attached exhibit. <br /> Conduct storm drainage inventory and collect information on pipe size,type and depth and the size and <br /> condition of the structure. <br /> Perform field note and data reduction on the collect information,this would include the registration of <br /> LiDAR data and preparation of the Supplemental survey data collected. <br /> Extract data from the LiDAR scans and incorporate that data into and overall dgn file of the existing <br /> conditions as surveyed. <br /> Prepare final dgn file with all the LiDAR and Supplemental data and that data collected on the Storm <br /> drainage structures. <br /> Determine height of overhead lines in the area of the project. <br /> ROW Survey-field work <br /> Coordination is expected with the City of Decatur throughout the Projects time frame along with scheduled <br /> meeting to discuss the projects development, schedule and process to keep the project moving forward.It is <br /> anticipated to coordinate with the Norfolk and Southern Railroad, the Canadian National Railroad and ADM <br /> on the potential impacts to the right of way and respective facilities within the proposed project limits. <br /> Conduct research of existing right-of-way documents and boundary information which may include <br /> subdivision plats,ROW plats,boundary surveys,boundary legal documents and railroad maps. <br /> Surveys will be completed for the properties that may be potentially impacted by the project.Additional <br /> Properties adjacent to those impacted may be surveyed to help with the determination of true boundary and <br /> right of way lines of those parcels and right of way affected.The following would be part of those efforts. <br /> � The contact of facility owners or managers and properties owners of those properties that surveys <br /> will be conducted upon.This may include letters mailed to each of the properties where surveys are <br /> anticipated and the field visit to inform the owners of the survey crew is on site. <br /> • Add horizontal control as needed to conduct the right of way and boundary surveys. <br /> • Conduct Field reconnaissance and field surveys to locate existing monumentation to determine <br /> existing right of way lines and boundary lines that the project may impact or may facilitate the <br /> analysis of those properties that may be potentially impacted. <br /> Scope 9-21-18 A-10 <br />