My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2018-129 Resolution to Approve a Professional Engineering Services Agreement with AECOM Technical Services, Inc. for Brush College / Faries Parkway Grade Separation, City Project 2009-33
COD
>
City Clerk
>
RESOLUTIONS
>
2018
>
R2018-129 Resolution to Approve a Professional Engineering Services Agreement with AECOM Technical Services, Inc. for Brush College / Faries Parkway Grade Separation, City Project 2009-33
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:42 AM
Creation date
10/2/2018 9:50:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2018-129
Res Ord Title
R2018-129 Resolution to Approve a Professional Engineering Services Agreement with AECOM Technical Services, Inc. for Brush College / Faries Parkway Grade Separation, City Project 2009-33
Department
Public Works
Approved Date
10/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> The proposal does not include any structural hours that may be required for shoring or earth retention <br /> systems that may be required for the water main relocation. <br /> The proposal does not include any hours for hydraulic modeling of existing and proposed water mains for <br /> adequacy or sizing for service requirements. <br /> Exclusions from the Bridge and Wall Structural Scope of Work: <br /> All approach walls are anticipated to be MSE types,cast-in-place walls are not anticipated. <br /> Design and details for any temporary shoring/support is not part of this Scope. <br /> MSE walls—Local and Global stahility calculations will be performed by the MSE wall manufacturer. <br /> Iterns provided bv Citv of Decatur: <br /> As built plans of the project area <br /> Existing utility maps,atlases,plan-markups <br /> City Standards <br /> Consultant Deliverables <br /> Soil Geotechnical Report(SGR)Technical Update Memo <br /> Roadway Geotechnical Report(RGR) <br /> Preliminary Environmental Site Assessment(PESA)Technical Update Memo <br /> Preliminary Site Investigation(PSI)Report <br /> Asbestos Containing Material—Lead Based Paint(ACM-LBP)Letter Report <br /> Revised Type,Size and Location(TSL)Plans <br /> Revised Intersection Design Study(IDS) <br /> Contract Plans and Documents for Construction <br /> Scope 9-21-18 A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.