Laserfiche WebLink
Exhibit A <br /> The proposal does not include any structural hours that may be required for shoring or earth retention <br /> systems that may be required for the water main relocation. <br /> The proposal does not include any hours for hydraulic modeling of existing and proposed water mains for <br /> adequacy or sizing for service requirements. <br /> Exclusions from the Bridge and Wall Structural Scope of Work: <br /> All approach walls are anticipated to be MSE types,cast-in-place walls are not anticipated. <br /> Design and details for any temporary shoring/support is not part of this Scope. <br /> MSE walls—Local and Global stahility calculations will be performed by the MSE wall manufacturer. <br /> Iterns provided bv Citv of Decatur: <br /> As built plans of the project area <br /> Existing utility maps,atlases,plan-markups <br /> City Standards <br /> Consultant Deliverables <br /> Soil Geotechnical Report(SGR)Technical Update Memo <br /> Roadway Geotechnical Report(RGR) <br /> Preliminary Environmental Site Assessment(PESA)Technical Update Memo <br /> Preliminary Site Investigation(PSI)Report <br /> Asbestos Containing Material—Lead Based Paint(ACM-LBP)Letter Report <br /> Revised Type,Size and Location(TSL)Plans <br /> Revised Intersection Design Study(IDS) <br /> Contract Plans and Documents for Construction <br /> Scope 9-21-18 A-9 <br />