Laserfiche WebLink
Exhibit A <br /> Construction Plans,Specifications,and Estimates <br /> This_proiect does not include the followin�components: <br /> Public update meetings will be held at City Hall meeting rooms. No hall rental fees are included. <br /> Advertisement cost will be paid by the City when the meetings are advertised and are not included in this <br /> proposal. <br /> Design review cost by railroad personnel may be requested by the respective railroads for their efforts on this <br /> project. This cost will be paid under Agreements between the City and the Railroads. <br /> Utility information will be obtained from the respective utility owners including City owned utilities and no <br /> SLJE Level A,B,utility locating effort or cost are inciuded in this proposal. <br /> Landscaping plans for permanent landscaping other than permanent erosion control seeding or sodding is not <br /> included in this proposal. <br /> IEPA fees for applications submitted for review and approval are not included in this proposal. Such fees <br /> will be paid by the City when the applications are submitted on behalf of the City. <br /> It is assumed that the CN Railroad will install their own Flashing Lights and Gates utilizing their railroad <br /> forces. Layout of the Flashing Lights and Gates for the ICC petition process will be by AECOM. <br /> Traffic volume counts and traffic projections are not included in this scope of work. The IDS update will be <br /> based on the traffic volumes shown on the current IDS submitted in the Phase I report. <br /> No Lifdpump stations are inclUded. Scope assumes all gravity storm sewers. <br /> No upgrades to the 4'x4' culvert under BCR and 7'x7' box culvert under William St. Scope assumes they <br /> are of adequate size and no HEC-RAS models or hydraulic reports assumed. <br /> No changes will be made to the 12"Storm sewer on James Randle Research Property. <br /> No design of inline or underground detention systems. <br /> No wick drains,or pavement underdrains. <br /> An IDOT Location Drainage Study will not be prepared. The Drainage Memorandum prepared may use or <br /> reference sections from a typical location drainage study but the report will not be as detailed in scope. <br /> No design or detailing of drop boxes. <br /> The proposal does not include the relocation of any water mains under the Norfolk Southern Rail yards as <br /> this portion of the project is not funded at this time. <br /> Any soil borings or Geotechnical reports required for the water main design and/or the railroads involved are <br /> not included at this time in this proposal. <br /> The proposal does not include providing any of the possible permitting requirements by railroads such as <br /> dewatering plan/vibration monitoring/shoring plan/settlement monitoring,etc. <br /> Scope 9-21-18 A_g <br />