Laserfiche WebLink
Item Coversheet 11130/2018 4:27:26 PM <br /> � <br /> Public Works <br /> DATE: 11l19/2018 <br /> MEMQ: 20!8-59 <br /> TO: Honarable Mayar Julie Moore Wolfe and City Cauncil Members <br /> FROM: Billy Tyus, Interim City Manager <br /> Matthew C.Newell,P.E.,City Engineer <br /> SUBJECT: <br /> Resolution to Appropriate Motar Fuel Tax Funds ta pay the City's Portion to Improve the Mound Road/Spring Creek West and <br /> Middle Bridges Structures 058-3035 and 058-3Q36 <br /> City Project 2017-06 <br /> SUMMARY RECQMIYIENDATIQN: <br /> It is recommended that the City Council authorize the Mayor to sign,and the City Clerk to attest,to the following resolutions: <br /> i. Resalution appropriating$500,000 in State Motar Fuel Tax(MFT)funds to pay for the City's$475,000 match with a <br /> $25,OOQ contingency, for the improvement of the Maund Road/Spring Creek West and Middle Bridges. The total estimated <br /> cast of the bridge improvement is$2,3'75,000. <br /> 2. Resolution autharizing a Locat Public Agency Agreement for Federai Participation ta irnprove the Mound Road/Spring <br /> Creek West and Middle Bridges, Structures OS8-3035 and 058-3036. The Agreernent autharizes a$2,3'75,000 bridge <br /> recanstruction project with Federal funding to a maximum of$1,900,000 with the baiance,estimated at$4'75,000 being owed <br /> by the City. <br /> BACKGROUND: <br /> All bridges in the United States, including thase owned by the City are required by the Federal Government to be inspected every <br /> twa years to assure the safety of the structures. The City's routine inspections of the Mound Road bridges over Spring Creek,and <br /> fallow-up inspections by the Illinois Department of Transportatian(IDOT), identified the need far structural repairs(see attached <br /> Iocation map). <br /> At the request of the City in early 2Q16,IDQT performed a rating inspection of the Mound Raad 1 Spring Creek West Bridge. On <br /> March 24,2016,the Department issued a letter ta the City lowering the rating of the bridge deck and superstructure ta a <br /> "3" (Serious Condition)on a scale frorn 0-9(O=Required Closed,9=New). Acting on an additional request from the City, ID{�T <br /> perforrned a rating inspection of the Mound RoadlSpring Creek Middle Bridge in 2Q17. On February?,2017,IDOT issued a <br /> letter to the City lowering the rating of the bridge deck and superstructure to a"2" (Critical Conditian)and ordered that the bridge <br /> be inspected every 12 months to ensure its continued safe condition. At that time, IDOT recommended that the City look to <br /> reptace the decks and superstructures on both bridges. The bridge superstructures include the entire bridge structure abave the pier <br /> tops,generally the driving surface(deck}and beams or girders supporting the driving surface. <br /> Federal funding was secured to assist in repiacing the beams and deck an this bridge. The attached Agreement allocates Federai <br /> funding up to$1,900,4Q0 af the estimated$2,375,000 tatal construction cost. The City match is estimated ta be$475,000. It is <br /> proposed that$500,000 in State Motor Fuel Tax funds be autharized to cover this cost alang with a$25,400 cantingency. The <br /> City is ultirnately respansible for all costs in excess af$1,900,000. <br /> Because the project will utilize Federal funds,the work will be completed under a State contract with the City praviding the daily <br /> project inspection under IDOT supervision. The Local Agency Agreement autharizes the use of Federal funds for the project and <br /> for the State to oversee the construction cantract. <br /> CQNSTRUCTIQN SCHEDULE: <br /> Page 1 of 2 <br />