GENEI2AL CONDITICINS <br /> GC-13 LIl?UIDATED DAMAGES <br /> Time is of the essence to the contract. Should the Contractor fail to carnplete the work <br /> within the working days stipulated in the contract or on or before the completion date stipulated <br /> in the contract or within such extended time as rnay have been allowed,the Contractor shall be <br /> liable and shall pay to the City the amount shawn in the following schedule of deductians, not as <br /> a penalty but as liQuidated damages, for each day of overrun in the contract time or such <br /> extended time as may have been allowed. The liquidated damages for failure to cotnplete the <br /> contract on time are approximate, due to the impracticality af calculating and proving actual <br /> delay casts. This schedule af deductions establishes the cast of delay ta accaunt for <br /> administration, engineering, inspection, and supervision during periods of extended and delayed <br /> perfarmance. The costs of delay represented by this schedule are understood ta be a fair and <br /> reasonable estimate of the costs that will be borne by the City during extended and delayed <br /> performance by the Contractor of the work, remaining incidental work,carrection of wark <br /> impraperly completed, or repair of work damaged as a result of the Contractar. The tiyuidated <br /> damage amaunt specified will accrue and be assessed until final completion af the total physical <br /> work of the contract even thaugh the work may be substantially complete. The City will deduct <br /> these liquidated damages from any rnonies due or to become due ta the Contractor from the City. <br /> Schedule of Deductions for Each Day of Overrun in Contract Time <br /> Original Contract Amount Daily Charges <br /> From Mare Than To and Including Calendar Day Wark Day <br /> $ 0 $ 100,000 $ 47� $ 67S <br /> 1 QQ,000 500,000 750 1,050 <br /> 540,000 1,000,000 1,02� 1,425 <br /> 1,000,000 3,OOO,q00 1,275 1,725 <br /> 3,£}00,000 6,000,440 1,425 2,000 <br /> 6,OOQ,000 12,000,000 2,300 3,450 <br /> 12,000,004 And over 5,800 8,125 <br /> When a completion date is specified,the daily charge wi11 be made far every day shown on the <br /> calendar beyond the specified completion date. When the time limit is specified as working days, <br /> the daily charge will be made far each additional working day,camputed as speci�ed in Article <br /> 108.04 of the Standard Speci�cations for Road and Bridge Construction, dated April 1, 2016, <br /> published by the Illinais Department of Transportation. If contracts are awarded on the basis af <br /> a multiple bid,the contract arr►ounts of the individual contracts carnprising the multiple bid will <br /> be totaled and the daily charge shall be that required for such tatal amaunt. <br /> 38 <br />