My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-28 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for 2019 Annual Water Main Replacement Project, Fairlawn Neighborhood, City Project 2019-10
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-28 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for 2019 Annual Water Main Replacement Project, Fairlawn Neighborhood, City Project 2019-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:41 AM
Creation date
3/6/2019 9:06:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
Resolution
Res Ord Title
R2019-28 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Burdick Plumbing & Heating Co., Inc. for 2019 Annual Water Main Replacement Project, Fairlawn Neighborhood, City Project 2019-10
Department
Public Works
Approved Date
3/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-26 TRENCH AND EXCAVATION SAFETY <br /> The Contractor will comply with all Federal, State and City laws, regulations and <br /> procedures governing trench and excavation safety. In no case will trench / excavation <br /> protection be less than the standards and regulations established by the "Department of Labor, <br /> Occupational Safety and Health Administration 29 CFR Part 1926, Occupational Safety and <br /> Health Standards - Excavations; Final Rule." <br /> For trench depths of 5 feet or more, the Contractor shall provide trench protection <br /> accordance with the applicable standards and regulations cited. Prior to the commencement of <br /> any excavation or trenching activity with anticipated depths of 5 feet or more, the Contractor <br /> shall provide to the Engineer, in writing, his procedures for fulfilling the safety requirements for <br /> trench / excavation protection. The written statement will include the name and credentials of <br /> the competent person, employed by the contractor, who is responsible far trench / excavation <br /> safety on the job site. <br /> GC-27 USE OF FIRE HYDRANTS <br /> Prior to any use of fire hydrants by the Contractor, a permit shall be obtained from the <br /> City if Decatur Water Services Division hereinafter referred to as "Water Services Division", in <br /> accordance with Sections 20 and 23 of Chapter 64 of the City Code. Water Services Division is <br /> located at 2600 North Jasper Street; phone, 217-875-5705. The permit will be issued at no <br /> charge to the Contractor. <br /> GG28 TERMINATION FOR PUBLIC CONVENIENCE <br /> The City may, by written order, terminate the contract or any portion thereof after <br /> determining that for reasons beyond either City or Contractor control,the Contractor is prevented <br /> from proceeding with or completing the work as originally contracted for, and that termination <br /> would, therefore, be in the public interest. Such reasons for termination may include, but need <br /> not be necessarily limited to, Executive Orders of the President relating to prosecution of war or <br /> national defense, national emergency which creates a serious shortage of materials, orders from <br /> duly constituted authorities relating to energy conservation, cessation of funding from third <br /> parties and restraining orders or injunctions obtained by third-party citizen action resulting from <br /> national or local environmental protection laws or where the issuance of such order or injunction <br /> is primarily caused by acts or omissions of persons or agencies other than the Contractor. <br /> When contracts, or any portion thereof, are definitely terminated or cancelled, and the <br /> Contractor released before all items of work included in his/her contract have been completed, <br /> payment will be made for the actual number of units of items of wark completed at contract unit <br /> prices, or as specified for partially completed items, and no claims for loss of anticipated profits <br /> will be considered. Reimbursement for organization of the work and moving equipment to and <br /> from the job will be considered where the volume of the work completed is too small to <br /> compensate the Contractor for these expenses under the contract unit prices, the intent being that <br /> an equitable settlement will be made with the Contractor. <br /> 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.