My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-55 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for M.L. King Watermain Flow Meter Test Vault Project, City Project 2019-01
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-55 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for M.L. King Watermain Flow Meter Test Vault Project, City Project 2019-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:48 PM
Creation date
4/17/2019 3:09:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-55
Res Ord Title
R2019-155 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for M.L. King Watermain Flow Meter Test Vault Project, City Project 2019-01
Department
Public Works
Approved Date
4/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M.L.King Watermain Flow Meter Test Vault Project <br /> City Project 2019-01 <br /> March 22,2019 <br /> ADDENDUM NO. 1 <br /> TO PLANS,SPECIFICATI4NS AND CONTRACT DOCUMENTS FOR: <br /> M.L.KING WATERMAIN FLOW METER TEST VAULT PROJECT <br /> CITY PROJECT 2019-01 <br /> DATED FEBRUARY 2Q19 <br /> AD-1-1 NOTICE <br /> 1.01 This Addendum No. 1 dated March 22,2019,to the Plans, Specifications <br /> and Contract Documents for the above captioned project,supersedes all <br /> contrary and conflicting information of the above-mentioned bid proposal <br /> documents,which are hereby supplemented in certain particulars as <br /> follows: <br /> AD-1-2 BID PROPOSAL <br /> 2.01 Insert the attached pre-bid meeting sign-in sheet and meeting minutes <br /> from the Pre-Bid meeting on March 22,2019. <br /> Please make the proper acknowledgment of addenda#1 on page 15 of your <br /> bidding documents. <br /> END OF ADDENDUM NO 1 <br /> � l q� <br /> City Engineer: � Date: ..�/o�� O ��/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.