My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-55 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for M.L. King Watermain Flow Meter Test Vault Project, City Project 2019-01
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-55 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for M.L. King Watermain Flow Meter Test Vault Project, City Project 2019-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:48 PM
Creation date
4/17/2019 3:09:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-55
Res Ord Title
R2019-155 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Company, Inc. for M.L. King Watermain Flow Meter Test Vault Project, City Project 2019-01
Department
Public Works
Approved Date
4/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-hid Meeting Draft Agenda <br /> for <br /> M.L. King Watermain Fiow Meter Test Vault Praject <br /> CITY PRt�►JECT 201.9-01 <br /> Public Worics Conference Room <br /> 10:00 a.m.,Friday,March 22,2019 <br /> I. Intraduction <br /> Introducti�rns by Paut Cusruell, City Engineer. This is a mandatory pre-fiid meeting. Qnly thvse <br /> bidders who are Iisted on the attendance sheet will be allowed to bid orr the project. <br /> II. Project Review <br /> This work shall corrsist vf iristalling a 96 inch manhole,ap,proximately 10 feet deep vver a <br /> 42 inch water main exiting the City's Soulh Water Treatment Plan! and installing a <br /> co�porativn stop in the main. The wvrk also includes site restoration. <br /> III. Minority Participation Goals Review of City Code Chapter 28,Article 10(Handout and <br /> Discussian}. <br /> A. Policy <br /> The City requires that generat eorrtractors show gvvd fuith efforts to meet the City's gvals of <br /> 10°r6 of the project amount be used to hire MBE subcontractors when subcontracting <br /> opportunities exist, aad 18%total hours are to be wvrked by rninority e»rployees. NQte that <br /> th�re are two goals that need to be addressed. <br /> B. Definitions <br /> The Prospective bidders are directed to the attached handout that provides an excerpt of the <br /> State's definition of a minority <br /> C. Project Goals and Good Faith Efforts <br /> 1, Subcontracting is not required but if a subcantractor is used a Good Faith <br /> Effart must be made to fill the stated goal. <br /> It is expected that a demonstratior�of"active"and "aggressive'"will include actual direct <br /> cvntact with or wvrking with a minvrity subcontractor in a manner that leads them to pravide <br /> actual quotes far the work to be subcontracted. This r's benefrted by the development of an <br /> ongving relationship with minority subcantractors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.