My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-59 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 36 (Eldorado Street) from Fairview Avenue to Church Street, City Project 2019-32
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-59 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 36 (Eldorado Street) from Fairview Avenue to Church Street, City Project 2019-32
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:40 AM
Creation date
4/17/2019 3:14:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-59
Res Ord Title
R2019-59 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 36 (Eldorado Street) from Fairview Avenue to Church Street, City Project 2019-32
Department
Public Works
Approved Date
4/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
each direction, retaining the existing B6.24 combination curb and gutter and providing for twa <br /> 12-foot wide through traffic lanes, 6-foot wide (and varies) median shoulders and 8-foot wide <br /> outer shoulders in each direction(8-foot wide outer shoulder transitions to a 12-foot wide right- <br /> turn lane at the eastbound approach to the intersection of FAP 323 (U.S. 36) and West <br /> Eldorado Street). <br /> 3. WEST ELDORADO STREET (U.S. 36) TO OAKLAND AVENUE: Mill and resurface the <br /> existing variable-width pavement, retaining the existing variable-width concrete median and <br /> providing for two 11-foot wide (minimum)through traffic lanes in each direction, a 10-foot wide <br /> (minimum) left-turn lane at the westbound approach to the intersection of FAP 323 (U.S. 36) <br /> and West Eldorado Street, a 10-foot wide (minimum) left-turn lane at the eastbound approach <br /> to the intersection of FAP 323 (U.S. 36) and Oakland Avenue, and a variable width outer <br /> shoulder eastbound at the service entrance to the Millikin University football field; modernize <br /> existing traffic signals and attached highway lighting and improve curb �amps to comply with <br /> the Americans with Disabilities Act (ADA) at the intersection of FAP 323 (U.S. 36) and West <br /> Eldorado Street. <br /> 4. OAKLAND AVENUE TO VAN DYKE STREET: Mill and resurFace the existing 54-faot edge- <br /> to-edge pavement width, retaining the existing curbs and providing for four 11-foot wide <br /> through tra�c lanes, two in each direction, and a single 10-foot wide two-way left turn lane; <br /> modernize existing traffic signals at the intersection of Eldorado Street(FAP 323)and Oakland <br /> Avenue; improve curb ramps crossing FAP 323 (U.S. 36) at the intersection of Oakland <br /> Avenue to comply with the Americans with Disabitities Act (ADA). <br /> 5. VAN DYKE STREET TO 400 FEET EAST OF VAN DYKE STREET: Improve curb ramps <br /> crossing Eldorado Street (U.S. 36) at the intersection of Van Dyke Street; extend the existing <br /> retaining wall located south of FAP 323 (U.S. 36) to the west as indicated on the plans. <br /> Pavement improvements shall be omitted from this portion of the project. <br /> 6. 400 FEET EAST OF VAN DYKE STREET TO WEST OF CHURCH STREET: Mill and <br /> resurface the existing 54-foot edge-to-edge pavement width, retaining the existing curbs and <br /> providing for four 11-foot wide through traffic lanes, two in each direction, and a single 10-foot <br /> wide two-way left turn lane (pavement width varies in the northernmost westbound lane in the <br /> vicinity of the Church Street intersection); mill and resurFace the 11-foot wide westbound right <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.