Laserfiche WebLink
Type of Work FEDERAL STATE CITY Totai <br /> COst % Cost % Cost % <br /> Ali construction <br /> costs exciuding $1,880,000 80 $470,000 20 $ 0 NA $2,350,000 <br /> the followin : <br /> Traffic Signals: <br /> Fairview Ave. & $212,700 90 $23,700 10 $ 0 0 $236,400 <br /> Etdorado St. <br /> Traffic Signals: <br /> US 36 8� $159,500 90 $17,700 10 $ 0 0 $177,200 <br /> Eidorado St. <br /> Traffic Signais: <br /> Eldorado St. & $212,700 90 $11,850 5 $11,850 5 $236,400 <br /> Oakiand Ave. <br /> Traffic Signais: <br /> Eldorado St. & $159,500 90 $11,850 6.7 $5,850 3.3 $177,200 <br /> Van D ke St. <br /> Traffic Signals: <br /> Eldorado St. & $212,700 90 $11,850 5 $11,850 5 $236,400 <br /> Monroe St. <br /> Traffic Signals: <br /> Eldorado St. & $212,700 90 $11,850 5 $11,850 5 $236,400 <br /> Edward St. <br /> New Mast Arm <br /> Mounted <br /> Highway $ p NA $ 0 NA $2,000 100 $2,000 <br /> Lighting at US <br /> 36 and West <br /> Eidorado St <br /> Adjust <br /> Manholes and $ 0 NA $ 0 NA $21,000 100 $21,000 <br /> Water Valves <br /> Subfotai $3,049,800 $558,800 $64,400 $3,673,000 <br /> P&C <br /> Engineering $457,500 $83,800 $9,700 $551,000 <br /> 15% <br /> Total $3,507,300 $642,600 $74,900 $4,224,000 <br /> Participation and reimbursement shall be predicated by the percentages shown above for the <br /> specified work. Cost shall be determined by rnultiplying the final quantities by the contract <br /> unit prices plus 15%for construction and preliminary engineering. Participation toward traffic <br /> signals shown above shall not exceed $59,500 which represents 125% of their estimated <br /> construction and engineering cost. <br /> -4- <br />