Type of Work FEDERAL STATE CITY Totai
<br /> COst % Cost % Cost %
<br /> Ali construction
<br /> costs exciuding $1,880,000 80 $470,000 20 $ 0 NA $2,350,000
<br /> the followin :
<br /> Traffic Signals:
<br /> Fairview Ave. & $212,700 90 $23,700 10 $ 0 0 $236,400
<br /> Etdorado St.
<br /> Traffic Signals:
<br /> US 36 8� $159,500 90 $17,700 10 $ 0 0 $177,200
<br /> Eidorado St.
<br /> Traffic Signais:
<br /> Eldorado St. & $212,700 90 $11,850 5 $11,850 5 $236,400
<br /> Oakiand Ave.
<br /> Traffic Signais:
<br /> Eldorado St. & $159,500 90 $11,850 6.7 $5,850 3.3 $177,200
<br /> Van D ke St.
<br /> Traffic Signals:
<br /> Eldorado St. & $212,700 90 $11,850 5 $11,850 5 $236,400
<br /> Monroe St.
<br /> Traffic Signals:
<br /> Eldorado St. & $212,700 90 $11,850 5 $11,850 5 $236,400
<br /> Edward St.
<br /> New Mast Arm
<br /> Mounted
<br /> Highway $ p NA $ 0 NA $2,000 100 $2,000
<br /> Lighting at US
<br /> 36 and West
<br /> Eidorado St
<br /> Adjust
<br /> Manholes and $ 0 NA $ 0 NA $21,000 100 $21,000
<br /> Water Valves
<br /> Subfotai $3,049,800 $558,800 $64,400 $3,673,000
<br /> P&C
<br /> Engineering $457,500 $83,800 $9,700 $551,000
<br /> 15%
<br /> Total $3,507,300 $642,600 $74,900 $4,224,000
<br /> Participation and reimbursement shall be predicated by the percentages shown above for the
<br /> specified work. Cost shall be determined by rnultiplying the final quantities by the contract
<br /> unit prices plus 15%for construction and preliminary engineering. Participation toward traffic
<br /> signals shown above shall not exceed $59,500 which represents 125% of their estimated
<br /> construction and engineering cost.
<br /> -4-
<br />
|