R2019-79 Resolution to Authorize Professional Engineering Services Agreement with Crawford, Murphy & Tilly, Inc. to Provide Construction Phase Engineering Services for the McKinley Sewer Rehabilitation Project, City Project 2017-22
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-79 Resolution to Authorize Professional Engineering Services Agreement with Crawford, Murphy & Tilly, Inc. to Provide Construction Phase Engineering Services for the McKinley Sewer Rehabilitation Project, City Project 2017-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:39 AM
Creation date
6/4/2019 5:18:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-79
Res Ord Title
R2019-79 Resolution to Authorize Professional Engineering Services Agreement with Crawford, Murphy & Tilly, Inc. to Provide Construction Phase Engineering Services for the McKinley Sewer Rehabilitation Project, City Project 2017-22
Department
Public Works
Approved Date
6/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
completion. If Contractor proposes two work crews to reduce construction <br /> time,Consulting Engineer will provide two on-site representatives.Consulting <br /> Engineer shall not be responsible for delays caused by Contractor.Construction <br /> phase engineering services performed by the Consulting Engineer beyond the <br /> contract completion time due to Contractor delays shall be considered extra <br /> work and Section I.E of this agreement should be followed. <br /> ii. On-site construction observation may include assisting Contractor with locating <br /> manhole structures in the field. <br /> iii. Maintain a daily record of Contractor's work for those days in which the <br /> Consulting Engineer is on site that includes notes on the contractor forces, <br /> subcontractors,equipment,field conditions, nature of work, progress of work <br /> and any potential extra work. <br /> iv. When cure time of the liner spans multiple days and exceeds normal work hours <br /> (for example, between the hours of 5:00 PM and 7:00 AM), Consulting Engineer <br /> will monitor contractor progress at select times: <br /> 1. At the start of the curing process <br /> 2. Midway through the night <br /> v. When Consulting Engineer is to be on-site outside normal working hours, <br /> Consulting Engineer may incur lodging expenses(11 nights assumed). <br /> d. Off-site technical assistance services include: <br /> i. Providing technical assistance to the City,on-site representatives and <br /> Contractor throughout the duration of construction to provide clarification and <br /> interpretation of the Contract Documents from the Consulting Engineer's office. <br /> ii. Responding to Contractor requests for information. <br /> e. Progress meetings services include: <br /> i. Scheduling,attending,coordinating and documenting twenty-two(22) bi- <br /> monthly progress meetings with the City and Contractor. <br /> f. Construction administration services include: <br /> i. Reviewing and recommending twelve(12)Contractor pay requests to City for <br /> processing <br /> ii. Review lien waivers <br /> iii. Reviewing certified payroll information provided by City to verify conformance <br /> with Davis-Bacon wages to perform a general check that all necessary payroll <br /> forms are submitted for all contractors on-site. <br /> iv. Prepare SRF reimbursement forms and submit to IEPA. <br /> v. Perform Davis-Bacon Act Compliance Verification (4 times) <br /> vi. Responding to change order requests from Contractor. <br /> vii. Ensure Contractor insurance certificate is current. <br /> g. Material test results services include: <br /> i. Logging, reviewing and proce�ssing material test results from the Contractor's <br /> work. <br /> h. Substantial Completion services include: <br /> i. Scheduling, performing and documenting substantial completion inspection of <br /> Contractor's work. <br /> ii. Preparing a recommendation of substantial completion. <br /> i. Project close-out services include: <br /> i. Reviewing and processing final lien waivers, <br /> ii. Requesting, reviewing and processing Contractor record information and <br /> preparing record drawings for completed project <br /> iii. Submit record drawings to IEPA. <br /> Last Revised:OS/21/2018 <br />