My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-90 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2019 Trenchless Long Lining Repairs Project, City Project 2019-28
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-90 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2019 Trenchless Long Lining Repairs Project, City Project 2019-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:37 AM
Creation date
6/18/2019 7:19:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-90
Res Ord Title
R2019-90 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2019 Trenchless Long Lining Repairs Project, City Project 2019-28
Department
Public Works
Approved Date
6/18/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, Pre-bid Meeting Minutes <br /> for <br /> ' 2019 Trenchless Lon Lining Re airs Pro'ect <br /> City Pro�ect 2019-2� � <br /> ' Public Works Conference Room <br /> 10:00 a.m. Wednesday, May 29, 2019 <br /> ' I. Introductions <br /> ' Introduction was made by Paul Caswell, City Engineer <br /> II. Project Review <br /> ' The ro osed im rovement 2019 Trenchless Lon Linin Re air Pro'ect <br /> P P P , g g P J � <br /> ' designated as City Project 2019-28, consists of performing approximately 13,667 feet of <br /> cured in place pipe long linings to repair damaged and failed sections of 8", 10", 12", <br /> 18", 24", 30"and 36"sanrtary and storm sewers at various locations throughout the <br /> ' City. The work also includes sewer cleaning, video inspection, lateral reinstatement, <br /> mobilization and traffic control. <br /> , III. Minority Participation Goals Review of City Code Chapter 28, Article 10 (Handout and <br /> Discussion). <br /> ' A. Policy <br /> The City requires that general contractors show good faith efforts to meet the <br /> ' City's goals of 10%of the project amount be used to hire MBE subcontractors <br /> when subcontracting opportunities exist, and 18% total hours are to be worked by <br /> minority employees <br />, B. Definitions <br /> The Prospective bidders are directed to the attached handout that provides an <br /> excerpt of the State's definition of a minority. <br /> ' C. Project Goals and Good Faith Efforts <br /> 1 1. Subcontracting Goal: 10% of total dollar amount should be performed by <br /> MBE if subcontracting opportunities are available. <br />' a. Subcontracting is not required but if a subcontractor is used a Good <br /> Faith Effort must be made to fill the stated goal. <br />' b. The Contractor shall put forward good faith efforts to "actively and <br /> aggressively" seek the participation of MBE or minority workers. <br /> Discuss options to assist in"actively and aggressively" seeking this <br />' participation. � <br /> It is expected that a demonstration of"active" and "aggressive" will include actual direct <br /> contact with or working with a minority subcontractor in a manner that leads them to provide <br />, actual quotes for the work to be subcontracted. This is benefited by the development of an <br /> ongoing relationship with minority subcontractors. <br />' <br />
The URL can be used to link to this page
Your browser does not support the video tag.