My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-90 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2019 Trenchless Long Lining Repairs Project, City Project 2019-28
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-90 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2019 Trenchless Long Lining Repairs Project, City Project 2019-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:37 AM
Creation date
6/18/2019 7:19:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-90
Res Ord Title
R2019-90 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2019 Trenchless Long Lining Repairs Project, City Project 2019-28
Department
Public Works
Approved Date
6/18/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' c. What is the City's expectation of a Good Faith Effort? <br />' The City regards a good faith effort, at a minimum, to include direct contacts with 2-3 MBE ' <br /> subcontractors for each subcontracting opportunity until the goal is met. The contacts must be <br /> with subcontractors that provide the type of work that is being subcontracted. Documented <br />' follow up requests are required if no response is received. The bidder is to provide all work, all <br /> contacts, the method of contact(email,phone,personal, etc.), and the results of each contact. <br /> Email requests with no reply or other evidence of direct contact are not considered to be <br />� acceptable direct contacts. <br /> City staff can have no contact with bidders regarding their bid submittal after bids have been <br />' opened, so their only opportunity to demonstrate a good faith effort, is to provide all supportive <br /> evidence with the bid document. For the benefit of the review that must be conducted by City <br /> staff, it is helpful for the bidders to group their direct contacts according to the subcontracting <br />, opportunity. <br /> 2. Minority Workers Goal: 18%total hours worked should be performed by <br />' minority workers. <br /> a. The City tracks this goal through ePrismSoft and prevailing wage <br />, reports when required. <br />, IV. Detailed Project Requirements <br /> A. End Seals Specified for all pipe <br />, B. Remove Scaling (Location 12 and 37) <br /> C. Modify Invert as necessary (Location 21) <br /> D. Transition Lmmg (Location 31) <br /> ' E. Modify Inlet Opening as required(Location 3, Storm Sewer) <br /> V. Other Items <br /> , <br /> Questions: <br /> ' <br /> Does the Ciry require painting on the ground to indicate the laterals?Answer: The laterals <br /> , location will need to identified to provide the Project Technician enough information to <br /> determine if the lateral is required to be reinstated. Some areas may require the tap location(s) <br /> to be marked in the field but will not be required if they can be identified from the reports. <br /> , Bidders should check Decatur Blueprint's website before submitting a bid to make sure there are <br /> no addendas missing. Only contractors on Decatur Blueprint's plan holder list will get updates � <br /> ' on addendas. You have to purchase the plans to get on their list. Simply downloading a set of <br /> plans from the website does not put you on the bidders list. <br /> ' END TIME 10:21 A.M. <br /> , <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.