Laserfiche WebLink
Smith <br /> Task 5-4: Treatment Strategies and Alternatives <br /> CDM Smith will develop a series of potential treatment strategies and alternatives to address the water <br /> quality challenges facing the Utility. Potential areas to be evaluated: <br /> • Process optimization <br /> • Evaluate the blending of existing surface water supplies with the new ground water source <br /> (efforts related to treatment of groundwater sources is assumed to be developed by the Interra <br /> Study—this effort is limited to coordination) <br /> • Expansion of the water treatment plant versus rehabilitation of aging facilities. <br /> • Disinfection by-products <br /> As part of this task,CDM Smith will develop conceptual layouts for up to three treatment alternatives to <br /> address the above water quality challenges. Comparison level cost estimates will be developed for the <br /> three alternatives.As part of this task, CDM Smith will evaluate the need for the addition of Claricones <br /> at the WTP. <br /> Task 5-5: Workshop <br /> CDM Smith will conduct a workshop with Utility staff to review the findings and recommendations <br /> related to the treatment technologies and process changes. Minutes from the workshop will be <br /> prepared by CDM Smith and submitted to the Utility.The feedback received in the meeting will be used <br /> to finalize this Section in the draft Water Master Plan. <br /> Task 5-6: Prepare Draft Technical Memorandum <br /> CDM Smith will prepare a draft technical memorandum describing the findings from Tasks 5-1 through <br /> 5-4 above.The memorandum will be written in a format that allows the final version to be easily <br /> incorporated in to the final Water Master Plan as described below in Task 8-1. <br /> Task 6: Distribution System Evaluation and Assessment <br /> Task 6-1: Kickoff Workshop <br /> CDM Smith will conduct a kickoff workshop specific to the distribution system evaluation and <br /> assessment.The purpose of this workshop will be to review the data collected in Task 2, determine the <br /> level of service expected to be provided by the Utility, select water demand scenarios to examine, <br /> outline CDM Smith's approach for evaluating the distribution system, and finalize the workplan for this <br /> Task jointly with the Utility. <br /> Task 6-2: Limited Assessment and Analysis of Distribution System <br /> CDM Smith will provide a limited assessment of the existing distribution system using the Utility's <br /> existing, calibrated hydraulic model to identify any potential deficiencies within the system. Potential <br /> deficiencies may be related to system pressures,fire flows and water age at the different water demand <br /> scenarios and level of service expectations discussed in Task 6-1. Work to be performed under this <br /> subtask includes: <br /> 6 � Page <br />