My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-192 Resolution Approving an Agreement with CDM Smith for Professional Engineering Services for the Water Utility Long-Term Sustainability Plan, City Project 2018-34
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-192 Resolution Approving an Agreement with CDM Smith for Professional Engineering Services for the Water Utility Long-Term Sustainability Plan, City Project 2018-34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:29 AM
Creation date
12/3/2019 2:49:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-192
Res Ord Title
R2019-192 Resolution Approving an Agreement with CDM Smith for Professional Engineering Services for the Water Utility Long-Term Sustainability Plan, City Project 2018-34
Department
Public Works
Approved Date
12/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith <br /> Task 8-1: Prepare Draft Water Sustainability/Master Plan <br /> CDM Smith will prepare a draft plan that documents the results of Tasks 2 through 7.The format of the <br /> report is expected to be the following: <br /> • Section 1—Executive Summary <br /> • Section 2—Introduction <br /> • Section 3—Water Supply and Demand <br /> • Section 4—Financial Assessment <br /> • Section 5—Water Quality and Regulatory Review <br /> • Section 6—Water Treatment Plant,Storage and Pump Station Assessment <br /> • Section 7—Distribution System Evaluation and Assessment <br /> • Section 8—Water Infrastructure Capital Improvement Plan <br /> The Long-term Sustainability Plan Report will also reference other ongoing studies.The Draft Plan <br /> Report will be provided in an electronic format. <br /> Task 8-2: Workshop <br /> CDM Smith will conduct a workshop with Utility staff to review the findings and capital improvement <br /> plan developed in Task 8-1. Minutes from the workshop will be prepared by CDM Smith and submitted <br /> to the Utility. <br /> Task 8-3: Finalize Long-term Sustainability Plan <br /> CDM Smith will finalize and submit the Long-term Sustainability Plan based upon comments received <br /> during the workshop conducted as part of Task 8-2. Five hard copies of the Plan Report will be provided <br /> in addition to an electronic copy. <br /> Task 8-4: Long-term Sustainability Plan City Council Presentation <br /> CDM Smith will prepare a PowerPoint Presentation for Staff's review and present the Water Long-term <br /> Sustainability Plan to City Council. <br /> Task 9: AWIA Risk and Resilience Assessment <br /> A new federal legislative requirement to America's Water Infrastructure Act of 2018 (AWIA)was <br /> signed into law on October 23, 2018,called the Community Water System Risk and Resilience Act <br /> (Act).This new Act is more broad than other assessments related to risks and resilience,and <br /> specifically calls out the risks of"natural hazards"that have not been assessed by all utilities in the <br /> past under previously required vulnerability assessments.The AWIA encompasses: <br /> ■ Pipes and constructed conveyances,physical barriers,source water,water collection and <br /> intake,pretreatment,treatment,storage and distribution facilities,electronic,computer,or <br /> other automated systems; <br /> ■ Monitoring practices; <br /> ■ Financial infrastructure (such as billing mechanisms); <br /> ■ Use,storage or handiing of chemicals; <br /> 9 � Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.