Laserfiche WebLink
Smith <br /> Task 6-5: Distribution System Water Quality <br /> CDM Smith will examine water quality in the distribution system related to water age, chlorine residual, <br /> potential disinfection by-product formation, nitrification, disinfection by products, and other issues. If <br /> any water quality issues are identified, CDM Smith will include recommendations on potential system <br /> improvements as part of the master plan.This effort is limited to a desktop analysis and review of recent <br /> studies and reports completed by the Utility. <br /> Task 6-6: Cost Estimating <br /> CDM Smith will provide an OPCC for the distribution system improvements recommended.The OPCC <br /> provided will be an order-of-magnitude estimate as defined by the American Association of Cost <br /> Engineers with an expected accuracy within 50%above and 30% below the actual construction costs.All <br /> OPCCs will be provided in "today's dollars" at the time the technical memorandum is published. <br /> Task 6-7: Prepare Draft Technical Memorandum <br /> CDM Smith will prepare a draft technical memorandum describing the findings from Tasks 6-1 through <br /> 6-6 above.The memorandum will be written in a format that allows the final version to be easily <br /> incorporated in to the final Water Master Plan as described below in Task 8-1. <br /> The memorandum will also include recommendations for the following distribution system related items <br /> to be implemented by the Utility in the future: <br /> • Valve exercise program <br /> • Hydrant exercise or replacement program <br /> • Leak detection/water loss program <br /> • Metering assessment program and metering improvements <br /> • Lead service line replacement program <br /> Task 6-8: Workshop <br /> CDM Smith will conduct a workshop with Utility staff to review the findings and recommendations <br /> related to the water distribution system. Minutes from the workshop will be prepared by CDM Smith <br /> and submitted to the Utility.The feedback received in the meeting will be used to finalize this Section in <br /> the draft Water Master Plan. <br /> Task 7: Contingency or Additional Tasks/Services <br /> This task allows the Utility to direct CDM Smith to complete additional evaluations.This task is treated <br /> as a contingency task for a not-to-exceed amount of$15,000 to be used at the Utility's discretion. <br /> Task 8: Long-term Sustain�bility Plan Develapment <br /> The purpose of Task 8 is to develop, review and finalize the Water Infrastructure Master Plan.The <br /> subtasks associated with Task 8 are the following: <br /> 8 � Fage <br />