My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2019-192 Resolution Approving an Agreement with CDM Smith for Professional Engineering Services for the Water Utility Long-Term Sustainability Plan, City Project 2018-34
COD
>
City Clerk
>
RESOLUTIONS
>
2019
>
R2019-192 Resolution Approving an Agreement with CDM Smith for Professional Engineering Services for the Water Utility Long-Term Sustainability Plan, City Project 2018-34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:12:29 AM
Creation date
12/3/2019 2:49:51 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2019-192
Res Ord Title
R2019-192 Resolution Approving an Agreement with CDM Smith for Professional Engineering Services for the Water Utility Long-Term Sustainability Plan, City Project 2018-34
Department
Public Works
Approved Date
12/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith <br /> ■ Cyber threats <br /> In preparation for the workshop,CDM Smith will conduct an initial threat characterization to <br /> identify threats to the water system from a comprehensive hazards list of malicious acts and <br /> natural hazards from the J100 Appendix E guidance, EPA,and additional threats as identified by the <br /> Utility.The J100 guidance is selective in order to produce high net benefit options for reducing risk <br /> and improving resilience.During the initial asset characterization stage,the following will be <br /> performed: <br /> ■ Identification and evaluation of critical assets,mission-critical functions,and supporting <br /> infrastructure and evaluation if there have been changes to the system that warrant an <br /> update to the critical asset list. <br /> ■ Identification of the critical internal and external supporting infrastructure which will likely <br /> include the following: Operations&Maintenance, Monitoring Practices (new),and Financial <br /> Infrastructure (new).This includes identifying any existing protective countermeasures and <br /> mitigation measures/features. <br /> CDM Smith will then conduct the formal Risk and Resilience Assessment.This may be conducted <br /> within the GIS/asset management database where possible or as a desktop exercise within <br /> Microsoft Excel.The final product will include a report with an executive summary of the methods <br /> and results.This process will follow the RAMCAP method in the AWWA J100 guidance.The specific <br /> tasks to conduct the assessment are as follows: <br /> 1. Finalize the asset and threat characterizations based on the Utility's priorities and the <br /> findings from previous tasks to identify,rank,and record the Utility's critical assets.The <br /> goal of this is to determine the critical and high-consequence facilities/assets and the high <br /> threat-likelihoods.These determine the"threat-asset pairs"which are the focus of the risk <br /> and resilience assessment.CDM Smith will use input from the workshops (conducted as <br /> part of previous tasks) and data review to ensure that medium-consequence or likelihood <br /> threat-asset pairs are also included,as appropriate.The high-priority threat-asset pairs will <br /> move on to the consequence analysis,Vulnerability Assessment,and Threat Analysis stages <br /> described below. <br /> 2. In order to conduct the Consequence,Vulnerability,and Threat Calculations for high- <br /> priority threat-asset pairs,the following will be performed: <br /> ■ Consequence Analysis: Develop and refine consequence metrics or criteria(such as <br /> financial,casualties,loss of revenue,or regional economic impact).The RAMCAP <br /> methodology is used to define ranges of consequence and analyze based on the consequence <br /> metrics for each threat-asset following the RAMCAP process and are measured in dollars. <br /> ■ Vulnerability assessment: For each critical threat-asset pair the vulnerability is determined <br /> by estimating the likelihood of an occurrence to the"all-hazards"threat.The output of a <br /> vulnerability analysis to malevolent incidents is the likelihood of success of the adversary for <br /> each specified attack scenario on each threat-asset pair,given that the attack is carried out. <br /> The parallel concept for natural hazards is the likelihood that the hazard will produce the <br /> consequences already estimated,given that the hazard occurs.This is expressed in a <br /> 11 � Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.