� Refer to Attachment B.
<br /> §4.1.2.2 A descripkioa af each Supplemeatal Serviee idenrified in Section 4.1.1 es the Owner's responsibility is
<br /> provided below.
<br /> (Descr►'be in detai!the Owner's Supplemerttal3ervices idenh;�ied ia Sectton 9.1.1 or,iJset farth in an exhibit,idend'fy
<br /> the exhibit.)
<br /> I Qwner shaU retain consultant and provide AreLtitect with Geateehnice!Engin�ring subsurFace soil reports and
<br /> recommendstions
<br /> §4.1.3 If the Owner identified a Sustainable Qbjective in Ardcle l,the Architect shalt provide,as a Suppiemeatal
<br /> Service,the Sustainability 5ervices required in AlA Doaument E2U4T'"-2017,Sustainebfe Projeets Exhibit,etteched
<br /> to this Agreemen�The Owner shali compensate the Arcditeat as provided in 5ection 11.2.
<br /> §4.2 Architect's Addfflonal Servlces
<br /> The A,rchitect may provide Additional Serviccs aHer execution of this Agreement without invalidating the Agreemeat,
<br /> Except for services required due to the fault of We Architect,aay Additioaal Services pmvided in aeeardenco with this
<br /> Section 4,2 shall entitle the Architect to compensatiop pursuant to Section 11.3 and an appropriate edjus4nent ia the
<br /> Arclutcct's schedule.
<br /> §4.2.9 Upon recognizing the need ko petform the£ollowiag AddiHonal Services,the Architect shall noNfy tt�e Owner
<br /> with reesanable pramptpess end explain the facts and circumstsnces giving rise to the n�cd.7'he Architect shall nat
<br /> proceed to provide the following Additional Services until the Architect receives the Owner's writtea suWorization:
<br /> .1 Services necessitated by a changc ia the Initial Infarmntioa,previous inst�vctions or approvals given by
<br /> We Uwaer,or a material change in the Project iacluding size,quality,complexity,the schedule io
<br /> Exhibit A,the Qwner's budget for Cost of thc Work,or procurement or delivery method;
<br /> .2 Serviees aecessitated by the enactment or revision of codes,laws,or re,guladans,including chenging or
<br /> editiag previoasly prepazed Instruments of Service;
<br /> .3 Changing or editing previously prepared Ittshurneuts of Service necessitated by official iuterpr,etetions
<br /> of applicable cades,laws or rcgulations that ere cither(a)contiacy to spxific intctprctations by the
<br /> applicable auWarities having jurisdicdon made prtar to the issuance of the building pecmit,ar(b)
<br /> coahary tu requiremeats of the Instruments of Service when those Inshwnents of Servicc were
<br /> prepared in accardaace with tha appliceble standerd of cere;
<br /> .4 Services aecessitated by decisioas of the Owner not rendercd in a timely manner or any other failure of
<br /> perfonnance an the part of thc Owncr ar We Owuer's consultants or conhactors;
<br /> .5 Prepariag digital models or other design dceumeutation for dansmission to the Owner's caasultants
<br /> end conhactors,or to ather Owner•authorized recipicnts;
<br /> .6 Prcparation of dcsign aad documrntation for attemete bid or proposal requests proposcd by thc pwncr,
<br /> .7 Prcparatian for,and attendancc at,a public prescntation,mccting on c�aring;
<br /> .8 Preperation for,and attendance at,a disputc r�solubion procecding or legal proceeding,ezcept whene
<br /> thc Architcct is party thcrcto;
<br /> .9 Evaluation of thc qualifica6ons of cnddcs providing bids or proposals;
<br /> .14 Consultation conceming rcplaccmcnt of Work resul6ng fmm 6rc or othcr cause during construction;
<br /> or,
<br /> .11 Assistaz►ce to the txtitial Decision Maker,if othcr than t6e Atchitccc
<br /> §4,2.2 To avoid dclsy in thc Construcdon Phase,thc Architcct s6all providc thc following Addirional Sccviccs,nodfy
<br /> the Owner with nasonable promptness,and explain the facts and circumstances giving rise to the need if,upon
<br /> rcceipt of thc Architect's notice,the(3wner determines that alt or parts oPthe services are nol requited,the Owner shall
<br /> give prompt written norice W tE�o Architect oCthc Ovmcr's dctermination.Thc Owucr shatl compcnsate the Architect
<br /> for We scrvices providcd prior to the Architcct's rcccipt of thc Qwner's notiee.
<br /> .1 Rcvicwing a Contractor's submittal out of sequcncc from thc submittal schcdulc appmvcd by the
<br /> Architcct;
<br /> ,2 Responding to Wc Contrector's requcsts for informetion that arc not prepared in accordancc with thc
<br /> Contract Documents or whcre such inforntation is availablc to thc Cflntracior from a carcful study and
<br /> AIA Uetument 8101*'—20Q7.Copydghl O 1974.1978,1987,1997.2�7 and Z017 by The Amedcen MsWWe�Areldlads./Ui 1lphts ANrvM.WARNING:Thic
<br /> �h' AIA�Ooaamanf Is protactod by U.S.Capyright Law and inl�medcnai Troatios.Unauthorizod ropruduciJon+or d3atribuUcn oFthls AU4�DocnmoM,ar uny .i3
<br /> I portlon of it,may result in aavare clWl and�criminal penaftics,and wll!be prosecuted to the mualmum ext¢nt poasibEu undnr the law.This dp�m�ml wa�
<br /> p�oAucod by AIA soflware ffi 14 39 55 ET o�71!??l2414 unda Order No.9334820348 which expires on 04/iDrz020,and Is not lor resale.
<br /> Usa Notas: (1230398033)
<br />
|