My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-118 Resolution Approving an Agreement with Clark Dietz Inc. to Provide Professional Engineering Services to the City of Decatur, City Project 2020-06
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-118 Resolution Approving an Agreement with Clark Dietz Inc. to Provide Professional Engineering Services to the City of Decatur, City Project 2020-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 10:41:33 AM
Creation date
9/14/2020 10:41:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-118
Res Ord Title
R2020-118 Resolution Approving an Agreement with Clark Dietz Inc. to Provide Professional Engineering Services to the City of Decatur, City Project 2020-06
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
documents,a listing of the Consulting Engineer's Opinion of Probable Costs,and a listing of the <br /> bids for each of the pay items submitted by each of the bidders. The Consulting Engineer shall <br /> tabulate the bids on an electronic spreadsheet form provided by the City's Representative. The <br /> Consulting Engineer shall assist the City's Representative in evaluating bids or proposals and in <br /> assembling and awarding contracts. The Consulting Engineer shall check the bidder's references <br /> and performance on prior projects. Based on the Consulting Engineer's evaluation of the bids <br /> and the qualifications of the bidders,the Consulting Engineer shall provide to the City's <br /> Representative a written recommendation for award of the contract to one of the bidders or <br /> recommend other action as may be appropriate. The final selection of the Construction Contractor <br /> is the sole responsibility of the City Council. <br /> 7. Completion Time. Complete the bidding phase and prepare and submit the recommendation to <br /> the City's Representative for the award of the Contract(s)within the time period set forth in <br /> Exhibit C,Project Timeline. <br /> E. CONSTRUCTION SURVEY AND LAYOUT PHASE. <br /> The Consulting Engineer or Surveyor shall,after written authorization to proceed with the <br /> Construction Survey and Layout Phase: <br /> 1. Duties. The Consulting Engineer or Surveyor shall provide horizontal and vertical control line <br /> and grade to enable construction of the improvement as depicted in the Project plans. The <br /> number of control points to be established by the Consulting Engineer or Surveyor shall be <br /> sufficient to permit the construction contractor("Contractor")to construct the improvement <br /> within the construction tolerances established in the Project specifications. In addition,the <br /> number of control points shall be consistent with standard engineering practice. <br /> 2. Replacement of Lost Control Points. Control points which are lost,damaged,removed or <br /> otherwise moved by the Contractor or others shall be promptly replaced by the Consulting <br /> Engineer or Surveyor and costs for such replacement shall be computed on a time and materials <br /> basis,and reimbursed by the City or its construction contractor. <br /> 3. Accuracy_ The Consulting Engineer or Surveyor shall provide the horizontal and vertical control <br /> points within the same measurement tolerances as the construction tolerances established in the <br /> Project specifications. The Consulting Engineer or Surveyor shall be responsible for the accuracy <br /> of the control points which are established. The Consulting Engineer or Surveyor shall be <br /> responsible for costs which may result from errors by the Consulting Engineer or Surveyor in <br /> placement of control points. <br /> The Consulting Engineer or Surveyor shall take all reasonable and customary actions to protect <br /> the control points established by the Consulting Engineer or Surveyor. <br /> 4. Completion Time. The Construction Survey and Layout Phase shall be completed within the <br /> time period set forth in Exhibit C, Project Timeline. <br /> F. CONSTRUCTION INSPECTION PHASE. <br /> The Consulting Engineer shall,after written authorization to proceed with the Construction Inspection <br /> Phase: <br /> 1. General Duties. The Consulting Engineer shall consult with and advise the City's Representative <br /> and act as its representative as provided herein and in the General Conditions of the construction <br /> contract for the Project. The primary responsibility of the Consulting Engineer in this phase of <br /> Last Revised:08/11/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.