d. Take multiple photographs of the Work and keep a log and file of the photos. The <br /> photographs shall be provided to the City's Representative upon demand and at project <br /> closeout. <br /> e. Record names,addresses and telephone numbers of all the Contractors,Subcontractors,and <br /> major suppliers of materials and equipment. <br /> 7. Reports. The Consulting Engineer shall, <br /> a. Furnish the City's Representative periodic reports,as required,on progress of the Work and <br /> of the Contractor's compliance with the progress schedule and schedule of Shop Drawings <br /> and sample submittals. <br /> b. Consult with the City's Representative,in advance of scheduled major tests,inspections,or <br /> start of important phases of the Work. <br /> C. Draft proposed Change Orders and obtaining back-up material from the Contractor,and make <br /> recommendations to the City's Representative regarding Change Orders and Field Orders. <br /> d. Report immediately to the City's Representative upon the occurrence of any accident. <br /> 8. Contract Interpretation; Review of Quality of Work. The Consulting Engineer shall: <br /> a. Issue all instructions of the City's Representative to the Contractor(s). <br /> b. Issue necessary interpretations and clarifications of the Contract Documents and in <br /> connection therewith prepare change orders as required,subject to the City's Representative's <br /> approval. <br /> C. Have authority,as a representative of the City,to require special inspection or testing of the <br /> work. <br /> d. Act as initial interpreter of the requirements of the Contract Documents and judge of the <br /> acceptability of the work there under and make decisions on all claims of the Contractor(s) <br /> relating to the acceptability of the work or the interpretation of the requirements of the <br /> Contract Documents pertaining to the execution and progress of the work. <br /> 9. Prepare Engineer's PU Estimate.The Consulting Engineer shall,based on the Consulting <br /> Engineer's on-site observations as an experienced and qualified design professional and on review <br /> of the Inspectors Daily Reports and Quantity Book,determine the amounts owing to the <br /> Contractor(s)and prepare an Engineer's Payment Estimate recommending the amount of <br /> payment for completed work. Such recommendations of payment shall constitute a representation <br /> to the City's Representative,based on such observations and review,that the work has progressed <br /> to the point indicated and that to the best of the Consulting Engineer's knowledge,information <br /> and belief,the quality of such work is in accordance with the Contract Documents(subject to an <br /> evaluation of such work as a functioning Project upon Substantial Completion,to the results of <br /> any subsequent tests called for in the Contract Documents,and to any qualifications stated in his <br /> recommendation),and that payment of the amount recommended is due the Contractor(s). The <br /> Engineer's Payment Estimate shall be prepared not less than monthly while construction is <br /> proceeding. The pay estimate shall be prepared on a spreadsheet form supplied by the City's <br /> Representative at the beginning of this phase of work. <br /> 10. Determination of Substantial Completion. The Consulting Engineer shall conduct an inspection <br /> to determine if the Project is substantially complete and conduct a final inspection to determine if <br /> the work has been completed in accordance with the Contract Documents and if each Contractor <br /> Last Revised:08/11/2020 <br />