My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
9/14/2020 10:45:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-119
Res Ord Title
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A- Supplement 1 <br /> 17. Prepare Utility Plan and Profile Sheets. Additional coverage at South BCR extension limits. <br /> Additional coverage on East Harrison east leg. <br /> 18. Prepare water main relocation and bore and jack permits. Additional location on Faries Parkway. <br /> Additional requirements in the new IC RR and NS permits. Covered above in Utility Coordination <br /> NS and IC RR. <br /> 19. Prepare sanitary sewer relocation and bore and jack permits. Additional requirements in the new IC <br /> RR permit. Covered above in Utility Coordination IC RR. Covered above in Utility Coordination IC <br /> RR. <br /> 20. Prepare Miscellaneous Utility Details.Additional location on Faries Parkway. <br /> 21. Prepare Water Main Relocation Plan and Profile Sheets. Additional location on Faries Parkway. <br /> 23. Prepare Water Main Detail Sheets. Additional location on Faries Parkway. <br /> 29. Prepare Soil Boring Key Map Sheet.Additional requirements in the new IC RR permit. <br /> 30. Prepare Soil Boring Log Sheets.Additional requirements in the new IC RR permit. <br /> 31. Prepare Cross Sections Sheets.Additional coverage at South BCR extension limits. Additional <br /> coverage on East Harrison east leg. <br /> Additional hours are presented for Phase II Roadway and Drainage PS&E work for AECOM and WHKS. <br /> Task 00600 Proiect Mangement <br /> Project Management task will include management of staff, schedules and deliverables and include internal <br /> meetings between team members including sub consultants on the additional scope items. Additional hours <br /> are presented for Project Management work for AECOM WHKS and QEI. <br /> Task 00700 OA/QC ITR <br /> Prior to making submittals,independent technical reviews(QA reviews)will be made of deliverables of the <br /> additional scope items. Additional hours are presented for QA/QC ITR work for AECOM WHKS and QEI. <br /> Additional. Scope 08-21-20 ExA 51-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.