My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
9/14/2020 10:45:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-119
Res Ord Title
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-Supplement 1 <br /> 9. The original scope proposal does not include any structural hours that may be required for shoring or <br /> earth retention systems that may be required for the water main relocation. Structural hours may be <br /> required as final location is set,and design started.At this time no additional scope of work or hours <br /> are requested. <br /> Concerns with Phase I utility relocations layout as shown: <br /> The close proximity of railroad tracks in some areas of the proposed preliminary water main relocation <br /> alignment is a cause for concern. Preliminary investigation of the requirements of the two railroads <br /> involved indicate that temporary and/or permanent shoring may be required to prevent movement of the <br /> tracks. As mentioned above in Notes 8 and 9,the proposal does not include hours to address the possible <br /> structural design and specialized permitting requirements of the railroads involved. The design of the <br /> structural elements required can be done by the Contractor during the permitting and construction <br /> approval process between the contractor and the railroad. Through design optimization the watermain <br /> has been moved away from the IC RR tracks. As design progresses some temporary shoring may be <br /> required for the perpendicular crossings of the IC RR for the watermain and the sanitary sewer. At this <br /> time no additional scope of work or hours are requested. <br /> CN Railroad Track Realm <br /> Railroad track realignment is required for approximately 1000 feet of the CN Railroad just north of Faries <br /> Parkway along the west side of Brush College Road. Hours in the original scope of work were for <br /> presentation of the Phase I design to the IC RR for their use in realigning the tracks. See new task IC RR <br /> Reconstruction PS&E. <br /> IC RR Reconstruction PS&E <br /> At the request of the IC RR and the City,AECOM will prepare IC RR track realignment design. Some items <br /> in the design will be included in the City construction package. While details are being worked out in the <br /> City/IC RR Agreement it is our understanding that AECOM is to prepare the realignment design and City <br /> Contractor plans to consist of everything up to the sub ballast. The IC RR will utilize the design prepared <br /> and bill of materials of outstanding items for ballast and trackwork, signal system warning lights and gates, <br /> and crossing surfaces construction with either their own forces or an IC RR Contractor. A warning lights and <br /> gates layout will be prepared by AECOM with the Geometry of the roadway for IC RR use with the <br /> signaling design department. Additional hours are presented for Phase 11 IC RR Reconstruction design and <br /> plan and quantity work. <br /> IC RR did not fully commit to design in Phase I and it is also requiring additional coordination to gain <br /> approvals. <br /> Prepare Roadway Plans(only items 10, 11, 13, 14, 16, 17, 18, 19,20,21,23,29,30,and 31 from original <br /> scope shown here for additional scope discussion) <br /> 10. Prepare Removal Plans. Additional coverage at South BCR extension limits. Additional coverage <br /> on East Harrison east leg. <br /> 11. Prepare Roadway Plan and Profile Sheets.Additional coverage at South BCR extension limits. <br /> Additional coverage on East Harrison east leg. Additional Roadway details will need to be <br /> developed for the guardrail tie into the existing railing,transitions between the different barriers and <br /> walls along south west side, and gutter transitions at the south limits. <br /> 13. Prepare Drainage Schedule. Additional coverage at South BCR extension limits. Additional <br /> coverage on East Harrison east leg. <br /> 14. Prepare Drainage Plan and Profile Sheets.Additional coverage at South BCR extension limits. <br /> Additional coverage on East Harrison east leg. <br /> 16. Prepare miscellaneous Drainage Details.Additional coverage on East Harrison east leg. <br /> Additional Scope 08-21-20 Ex<A SI-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.