My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
9/14/2020 10:45:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-119
Res Ord Title
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A- Supplement 1 <br /> Detailed Additional Scope of Services <br /> Brush College Road at Norfolk Southern Railroad and Faries Parkway <br /> Phase II Engineering Services <br /> By AECOM Technical Services,Inc. <br /> For Decatur Illinois <br /> August 21,2020 <br /> General <br /> This document serves as the scope of additional work for the preparation of an update to the Phase I <br /> Combined Design Report and Phase II Engineering Services for an overpass carrying Brush College Road <br /> over the Norfolk Southern Railroad and Faries Parkway in Decatur,Illinois. This is the basis for the <br /> supplemental agreement number one with the City of Decatur, Illinois. The scope of work has been broken <br /> down into the following task to match the Prime agreement: <br /> Task 00100 Survey and Field Work <br /> Task 00200 Phase I Update—VE CR ABC <br /> Task 00300 Reports <br /> Task 00400 Phase II Design-Plans Special Provisions and Estimates <br /> Task 00500 City and Stakeholder Coordination <br /> Task 00600 Project Management <br /> Task 00700 QA/QC ITR <br /> Project Understanding and Additional Scope of Services <br /> It is our understanding that a Phase I Combined Design Report Section 09-00933-00-BR was prepared dated <br /> March 2015 for Brush College Roadway from just South of Williams Street to just north of Faries Parkway <br /> including two overpasses over Norfolk Southern Railroad. The project was broken into three constructible <br /> segments. Segment Three included an overpass over Faries Parkway and Norfolk Southern Railroad at the <br /> intersection of Faries Parkway. Funding for this third segment was obtained. As segment two,an overpass <br /> over the Norfolk Southern Railroad Yard,has yet to be constructed modifications to the Phase I design was <br /> required for the third segment to tie into the existing geometry of Brush College Roadway south of Faries <br /> Parkway. Coordination meetings and Value Engineering and Constructability Reviews lead to additional <br /> agreed upon modifications to the Phase I design. Additional scope of service items were determined through <br /> the design process and coordination with the City,D7 and IC RR. These additional scope items are further <br /> described below. <br /> Roadway Reconstruction Limits <br /> It was anticipated that the project limits would extend from station 50+00 just south of Olive Street to station <br /> 78+00 just north of Harrison Street. The project limits will now require extension south to the existing NS <br /> RR viaduct on Brush College Road(BCR). The new project limit south is station 46+59.44 and work will <br /> require tying into the existing RR viaduct as the previous south limit on BCR was station 50+00. <br /> Task 00100 Survey and Field Work <br /> Geotechnical Soil Borings-field work <br /> Railroad Permit Soil Geotechnical Borings and Report(PGR) for Utility Crossing Permits <br /> Additional Geotech soil borings and signed reports by the Geotechnical Soil Boring subconsultant are now <br /> required under the new RR Utility Crossings Permit applications. Original scope of work did not include any <br /> soil borings or Geotech reports that are now required for the water mains,sanitary sewer and storm sewer <br /> crossings for the IC RR and NS RR involved. A current download of the Railroad Utility Crossing Permit <br /> now shows that a Permit Geotechnical Report(PGR)is required with each application. SKS has been used <br /> Additional Scope 08-21-20 ExA S1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.