Laserfiche WebLink
Exhibit A- Supplement 1 <br /> Detailed Additional Scope of Services <br /> Brush College Road at Norfolk Southern Railroad and Faries Parkway <br /> Phase II Engineering Services <br /> By AECOM Technical Services,Inc. <br /> For Decatur Illinois <br /> August 21,2020 <br /> General <br /> This document serves as the scope of additional work for the preparation of an update to the Phase I <br /> Combined Design Report and Phase II Engineering Services for an overpass carrying Brush College Road <br /> over the Norfolk Southern Railroad and Faries Parkway in Decatur,Illinois. This is the basis for the <br /> supplemental agreement number one with the City of Decatur, Illinois. The scope of work has been broken <br /> down into the following task to match the Prime agreement: <br /> Task 00100 Survey and Field Work <br /> Task 00200 Phase I Update—VE CR ABC <br /> Task 00300 Reports <br /> Task 00400 Phase II Design-Plans Special Provisions and Estimates <br /> Task 00500 City and Stakeholder Coordination <br /> Task 00600 Project Management <br /> Task 00700 QA/QC ITR <br /> Project Understanding and Additional Scope of Services <br /> It is our understanding that a Phase I Combined Design Report Section 09-00933-00-BR was prepared dated <br /> March 2015 for Brush College Roadway from just South of Williams Street to just north of Faries Parkway <br /> including two overpasses over Norfolk Southern Railroad. The project was broken into three constructible <br /> segments. Segment Three included an overpass over Faries Parkway and Norfolk Southern Railroad at the <br /> intersection of Faries Parkway. Funding for this third segment was obtained. As segment two,an overpass <br /> over the Norfolk Southern Railroad Yard,has yet to be constructed modifications to the Phase I design was <br /> required for the third segment to tie into the existing geometry of Brush College Roadway south of Faries <br /> Parkway. Coordination meetings and Value Engineering and Constructability Reviews lead to additional <br /> agreed upon modifications to the Phase I design. Additional scope of service items were determined through <br /> the design process and coordination with the City,D7 and IC RR. These additional scope items are further <br /> described below. <br /> Roadway Reconstruction Limits <br /> It was anticipated that the project limits would extend from station 50+00 just south of Olive Street to station <br /> 78+00 just north of Harrison Street. The project limits will now require extension south to the existing NS <br /> RR viaduct on Brush College Road(BCR). The new project limit south is station 46+59.44 and work will <br /> require tying into the existing RR viaduct as the previous south limit on BCR was station 50+00. <br /> Task 00100 Survey and Field Work <br /> Geotechnical Soil Borings-field work <br /> Railroad Permit Soil Geotechnical Borings and Report(PGR) for Utility Crossing Permits <br /> Additional Geotech soil borings and signed reports by the Geotechnical Soil Boring subconsultant are now <br /> required under the new RR Utility Crossings Permit applications. Original scope of work did not include any <br /> soil borings or Geotech reports that are now required for the water mains,sanitary sewer and storm sewer <br /> crossings for the IC RR and NS RR involved. A current download of the Railroad Utility Crossing Permit <br /> now shows that a Permit Geotechnical Report(PGR)is required with each application. SKS has been used <br /> Additional Scope 08-21-20 ExA S1-1 <br />