My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
9/14/2020 10:45:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-119
Res Ord Title
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A- Supplement 1 <br /> Overpass Design—Superstructure and substructure <br /> Perform design of all elements of superstructure and substructures,including deep foundation elements. <br /> From the current SGR,it is anticipated that steel H piles will be utilized for the deep foundations. <br /> Seismic Analysis and Design of Brush College Road over Faries&NS RR. The Seismic Zone for the <br /> overpass has changed from Zone 1 to Zone 2 during updates to the SGR. Both the PH I TSL and the PH I <br /> Geotech report indicated Seismic Performance Zone 1 -Revised SGR calls for Seismic Performance Zone 2. <br /> Bridge design scope was based on SPZ1. This requires additional design and analysis by the structures <br /> group for Zone 2. <br /> 1. 3-D Finite Element modeling of the bridge for Seismic Analysis <br /> 2. Superstructure Analysis and Design-End Cross Frame Design <br /> 3. Superstructure Analysis and Design-Bearing Design <br /> 4. Substructure Design-Abutment design and lateral load analysis and design of piles <br /> 5. Substructure Design-Pier Design and lateral load analysis and design of piles <br /> Additional hours are presented for Phase 11 BCR Structure Design,Plan and Quantity work. <br /> Exclusions from the Bridge and Wall Structural Scope of Work: <br /> In the original scope all approach walls were anticipated to be MSE wall types,and no cast-in-place walls <br /> were anticipated. Design and details for any temporary shoring/support was not part of this scope. MSE <br /> walls—Local and Global stability calculations will be performed by the MSE wall manufacturer. <br /> Extension of the southern limit of the project on BCR now requires design of a cut wall. QEI has been <br /> assigned this PH 11 design and PS&E preparation for this cut wall. Additional hours and QEI subconsultant <br /> cost are presented for this cut wall design and plan preparation work. <br /> Miscellaneous Structure Design <br /> Additional Miscellaneous Structure Designs are required as the project limit extended south to the NS Yard <br /> Viaduct. <br /> Modification to Existing RR Pier to incorporate Single Slope Barrier-Total Wall length-50 Ft <br /> 1. Data Collection <br /> 2. Review of Structural adequacy of existing pier footing <br /> 3. Structural Plans and Specifications -General Plan and Details <br /> 4. Single Slope barrier Details and Bill of Material <br /> Proposed Retaining Wall supporting roadway fill and extend above roadway to serve as single slope barrier- <br /> Total Wall Length- 150 Ft <br /> 1. Geotechnical analysis and recommendations <br /> 2. Proposed Retaining Wall Design <br /> 3. Structural Plans and Specifications -General Plan and Elevation <br /> 4. Structural Plans and Specifications -General Notes and Bill of Material <br /> 5. Structural Plans and Specifications -Wall Plan and Elevation <br /> 6. Structural Plans and Specifications-Wall Cross Sections,Details&Bill of Material <br /> Cast in Place Barrier and Anchorage Slab Design and Details-Total Length 310 Ft-(from north end of <br /> proposed retaining wall to south end of proposed MSE wall along IC RR <br /> 1. Geotechnical analysis and recommendations <br /> 2. Proposed Anchorage Slab Design <br /> 3. Structural Plans and Specifications -General Plan and Elevation <br /> Additional Scope 08-21-20 Ex<A S14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.