My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkwa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
9/14/2020 10:45:22 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-119
Res Ord Title
R2020-119 Resolution Authorizing City of Decatur Supplement #1 to the Professional Engineering Services Agreement Between the City of Decatur and AECOM for Design Services for the Improvement of Brush College Road over Faries Parkway
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-Supplement 1 <br /> 4. Structural Plans and Specifications-General Notes and Bill of Material <br /> 5. Structural Plans and Specifications—Anchorage Slab and Barrier Plan and Elevation <br /> 6. Structural Plans and Specifications -Cross Sections,Details&Bill of Material <br /> WHKS excluded structural design and plan preparation in the original scope of work for drainage junction <br /> chambers. Without a phase I drainage study it was unknown if junction chambers would be required. As <br /> design progressed the following design effort and drainage structures are required. <br /> 1. Phase II Structural Design of Junction Chambers and Plan Development(4 locations) <br /> • Review design loads and design criteria. <br /> • Coordinate preliminary design layout with proposed storm sewer <br /> • Design and Check Junction Chamber. <br /> • Prepare structure sheets: GPE, General Notes and Bill of Materials, Chamber Wall Sections <br /> and Details and Miscellaneous Detail Sheets. <br /> • Coordinate pay items for completion of Special Provisions and Checksheets. <br /> • Coordinate pay items for completion of Estimate of Time and Estimate of Cost. <br /> • Prepare quantity calculations for Junction Chamber pay items. <br /> Box Structure: STA 69+78.78 L25.58' <br /> 48" RCP(N) <br /> 36" RCP(N) <br /> 15" RCP(W) <br /> 36" RCP (S) <br /> 48" RCP(E) <br /> Box Structure: STA 69+80+28 R70.26' <br /> 48" RCP (W) <br /> 15" RCP(E) <br /> 60"x38" RCP(E) <br /> Box Structure: STA 708+15.73 R13.77' <br /> 60"x38"RCP (NE) <br /> 42" RCP (W) <br /> 42" RCP(SE) <br /> Box Structure: STA 68+72.68 R0.8' <br /> 12" RCP(W) <br /> 12" RCP(S) <br /> 12" RCP(E) <br /> 15" RCP(NE) <br /> Additional hours are presented for Phase II BCR Miscellaneous Structure Design,Plan and Quantity work. <br /> Drainage Design <br /> Drainage Modeling,Analysis and Study-Existing <br /> AECOM analyzed the existing 72"culvert under Faries Parkway to present findings to the city. <br /> Additional hours are presented for Study of Existing drainage culvert work. <br /> Additional Scope 08-21-20 Ex<A S1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.