My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-185 Resolution to Approve Preliminary Engineering Services Agreement and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street, SN 058-6001 City Project 2020-22
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-185 Resolution to Approve Preliminary Engineering Services Agreement and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street, SN 058-6001 City Project 2020-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:45 PM
Creation date
12/22/2020 3:49:58 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-185
Res Ord Title
R2020-185 Resolution to Approve Preliminary Engineering Services Agreement and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street, SN 058-6001 City Project 2020-22
Department
Public Works
Approved Date
12/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> City of Decatur-2021 Bridge Inspections <br /> Garfield Ave over 22nd Street,SN 058-6001 �0� <br /> Summary-Engineering Manhour&Fee Estimate <br /> City of Decatur Bridge Inspections 2021 -Garfield Ave over 22nd Street,SN 058-6001 <br /> Labor Direct Cost of Total <br /> Task No. Description Manhours <br /> Costs* Costs Subs Costof Total <br /> 100 Bridge Inspection 107.0 $12,156.64 $0.00 $0.00 $12,156.64 40.56% <br /> 200 Bridge Condition Report Update 80.0 $9,190.74 $0.00 $0.00 $9,190.74 30.66% <br /> 300 Project Management 30.0 $4,937.62 $0.00 $0.00 $4,937.62 16.47% <br /> 400 Other Direct Costs 0.0 $0.00 $3,687.31 $0.00 $3,687.31 12.30% <br /> Totals 217.0 $26,284.99 $3,687.31 $0.00 $29,972.30 100.00% <br /> *With 2.778 multiplier <br /> Notes: <br /> (1) Bridge Inspection of SN 058-6001 will be completed in January 2021. <br /> (2) IDOT Inspection Forms will be submitted within 10 working days after the inspection is completed. <br /> (3) City of Decatur will provide all traffic control required for the topside deck inspection (on Garfield Ave). <br /> For the underside superstructure inspection(on 22nd Street),City will provide traffic control, including <br /> arrow boards where required per IDOT Highway Standard 701421, but crash truck behind manlift <br /> will be provided by a traffic control Contractor. <br /> (4) Refer to Detailed Scope of Work for more information. <br /> A-7 <br /> Tasks&Manhours-Garfield Ave over 22nd Street.xlsx Rev 0- 12/10/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.